®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Note: When raising net, it must be done
in increments across the entire span
A
Hoist System
Detail B
Pear Clip
B
Net to End Post
Vertical Support Cable
Detail C
Pear Clips
Spaced approx.
every 12",
entire length of
vertical cable
(
Left and Right
End Posts
Only
)
23
22
Brass Ring
Detail A
Brass Ring
B
B
Cable Clamp
Top of net
is bound
to a steel
cable
Installation Notes:
Lay net on ground across span of posts.
1.
Make sure net is centered accross span
of posts.
Using a Pear Clip Secure upper net
2.
corners to End Post Vertical Support
Cables
(as shown in Detail C)
Secure Brass Rings to top of net using
3.
Cable Clamp
(as shown in Detail A)
.
One ring and clamp per post and they
should be centered as close as possible
to its coinciding post.
After Brass Rings have been secured to
4.
net, clip ring into it's posts hoist system
Pear Clip
(as shown in Detail B)
.
As net is being raised make sure to
5.
secure net sides to the vertical support
cables using provided
Pear Clips
(refer
to Detail C)
. Pear Clips should be
spaced approx. 12" or 4 net squares.
Once net has been completed raised tie
6.
hoist ropes onto cleat.
Note: Hardware denoted
with "B" is included in item
#3 "Hoist Rope"
SBS-40
Assembly Instruction
Net Attachment
1
2
of 1
2