®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
5'-0"
60"
(REF)
10'-0"
120"
31'-0"
372"
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Net Pulley
System
Right
View
Post Cap
pre-installed
Lower Horizontal
Cable Collar
w/ Tensioner
Assembly
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Upper Vertical
Cable Collar
Assembly
(see collar orientation
detail)
Front
View
40.00°
Collar Orientation
Detail
(Note:
ONLY
vertical cable collars
should be turned away from netting)
Cleat
Detail
10
8
9
8
9
6
7
1
Eyebolt
Detail
3
4
5
Open
Eyebolt Collar
Detail
Installation Notes:
Lower Collars:
From bottom
1.
of pole slide the lower vertical
cable collar, lower horizontal
collar and and debris ring
(
optional
) into position. To
allow proper insertion into
ground sleeve, lower most
collar should be 60" from end
of post.
Before securing collars
into place make sure to rotate
the lower vertical collar approx
40°.
(
refer to diagram
)
Cleat:
Is to be installed so that
2.
it is on backside of post,
opposite net. Screws will be
inserted through cleat and post
and secured on net side using
flat washers, Nylock hex-nuts
and cap nuts. (
refer to
diagram
)
Mid Collar:
Note orientation of
3.
collar on post. From top of pole
slide the open eyebolt collar
into position
(refer to
diagram)
and secure into
place.
Eyebolt:
Pulley system comes
4.
preassembled to eyebolt.
Install washer onto eyebolt
then insert eyebolt with washer
through front side of hole at
top of post. From opposite
side secure eyebolt into place
using a flatwasher and self-
locking hex-nut. (
refer to
diagram
)
Upper Collar:
From top of
5.
pole slide the upper vertical
cable collar into position (collar
should rest on eyebolt
washers). Before securing into
place make sure to rotate the
collar approx 40°. (
refer to
diagram
)
Make sure warning labels are
6.
present on goal posts.
Note:
Post assembly should
be done with post
laying down on flat
level surface.
SBS-40
Assembly Instruction
Left End Post
7
of 1
2