3
1.9
For
INSTALLATION WITH COMPRESSOR,
place the compressor assembly,
Figures 1 and 2 (50), between two level surfaces so that the underside of the
assembly is exposed.
DO NOT INVERT
. Remove the two red shipping bolts
located on the underside and retain for future use.
1.10 Place the generator unit and compressor unit side by side as shown in Figures 1
and 2, with the compressor unit, Figures 1 and 2 (50), left of the generator unit as
shown. Place the ballast tank Figures 1 and 9 (16), on top of the compressor
unit and install the curved metal tubing which is supplied and labeled, Figure 2
(53), between the compressor outlet fitting and the check valve on the ballast
tank, Figures 1, 2 and 9 (24).
1.11 Install the ¼-inch o.d. plastic tubing, Figure 1 (51), supplied between the outlet
fitting on top of the ballast tank and the PUMP fitting, Figure 1 (58), on the rear of
the generator unit. Lastly, install the dump muffler in the DUMP fitting Figure 1
(60) and direct downward.
1.12 Connect the compressor power cord into the AUX POWER outlet on the lower
rear of the generator unit, as shown in Figure 1. Once the six-foot power cord
has been inserted into the proper electrical outlet, the unit is ready for operation.
Summary of Contents for 737 Series
Page 4: ...v 20 737 10 ROTAMETER FLOW NOMOGRAPH 62 ...
Page 11: ...7 3 16 Follow the procedures as outlined in Section 3 7 through Section 3 13 ...
Page 36: ...32 defective check valve ...
Page 48: ...44 ...
Page 49: ...45 ...
Page 50: ...46 ...
Page 51: ...47 ...
Page 52: ...48 ...
Page 53: ...49 ...
Page 54: ...50 ...
Page 55: ...51 ...
Page 56: ...52 ...
Page 57: ...53 ...
Page 58: ...54 ...
Page 59: ...55 ...
Page 60: ...56 ...
Page 61: ...57 ...
Page 62: ...58 ...
Page 63: ...59 ...
Page 64: ...60 ...
Page 65: ...61 ...
Page 66: ...62 ...
Page 67: ...63 ...
Page 68: ...64 ...
Page 69: ...65 ...
Page 70: ...66 ...
Page 72: ...68 ...