9. Maintenance
operation manual
9.1 Disposal of Batteries
02/2022
page 32
Inspect all connectors for signs of corrosion, damaged insulation, or discoloration
from elevated temperature/combustion. Check cables for loose,
broken, or burned areas.
Remove dirt and objects from the radiator.
is cked.
Tighten all terminal screws with the specified torque. Check if the LCD meets the
requirements.
Have an authorized electrician repair or replace defective cables if necessary.
For more information contact us by phone
Check for dirt, nesting insects, or signs of corrosion. Take corrective action as soon
as possible.
Make use of the certified and professional recycling service of our AKKU SYS
team.
If necessary, take corrective action.
Electric shock hazard!
Make sure all power is off before performing any maintenance.
on the hotline +49 4101/376760, at
or use
the QR code:
WARNING!
Look for troubleshooting or error indications.
Make sure the insulation is not damaged.
Make sure the airflow around the solar charge controller is not blocked
Ensure that all system components are effectively and securely connected to ground.
For optimal system performance, the following inspection and maintenance tasks
should be performed at least twice a year:
MPPT Solar Charge Controllers A100/20, A100/40, A150/60
Machine Translated by Google