
18
IOM D-070-P
•
Separate the Supporting Ring from the Rolling Diaphragm Sealing [1], [2].
•
Fold backwards the rubber part of the Rolling Diaphragm Sealing [1] and check for any cracks and tears [2]. Replace the entire
Rolling Diaphragm Sealing Assembly if any damage is detected. Do not open screws of the assembly under any circumstances!
5.5 Assembly and Testing for Leaks
•
Reassemble the Dynamic Valve in reverse order of its maintenance section.
•
Reconnect the Pilot to the air valve.
•
Slowly open the isolating valve located on the riser under the air valve.
•
Look for leaks in the Outlet Discharge Elbow.
•
Check the air valve for proper operation.
1
2
2
1