
14
IOM D-070-P
•
Dip the head end of the Rolling Seal into the liquid soap solution [1]
•
Reassemble the Pilot by inserting the loose end of the Rolling Seal into its designated groove in the Pilot Body [2]; making sure
that the insertion direction of the seal’s end is as shown by the arrows.
5
6
1
2