
10
IOM D-070-P
5. PERIODIC MAINTENANCE
Please note that the periodic maintenance of the air valve is an integral part of the proper pipeline maintenance
regime; it should be maintained at least once a year in accordance with the quality and composition of the fluid in
the system.
Important:
Before performing any work on the air valve, make sure that all workers on site are familiar with the
Safety Instructions section of this document and with all the relevant local and general safety instructions, standards
and work regulations.
5.1.
Preparation
5.1.1.
Required tools and materials:
•
4.5mm roll pin punch
•
Small bowl with kitchen type liquid soap
5.1.2.
Releasing Pressure
•
Shut the isolating valve located on the riser under the air valve.
•
Carefully release the pressure and drain the air valve
•
Important: Discard liquid to comply with local regulations