ENG 13
Installation and Operation
Methods
Our company recommends that this unit is installed by trained professionals as the installation process is somewhat complex and requires the use of
various tools. However, if you decide to install this unit by yourself, please refer to the following steps and diagrams
11.
If you move to the unit to operate
in a different location, wait an hour
before plugging and activating the
unit.
Installation Methods
Operation Methods
1. Turning on the Power
1.
Remove tapes attached at the time of shipping to secure parts.
2.
Place the product on a flat-surface, horizontal and structurally sound
floor.
3.
Maintain a sufficient distance from the Wall to place the unit. At least
20 cm is recommended.
4.
Check the inlet water pressure is between the recommended
values of 147~490 kPa (1.47 Bar~4.9 Bars).
WARNING:
Operating under high pressure conditions may cause the
products’ pipes to rupture, resulting in leakage, the machine working
improperly, or even serious property damage.
In places where inlet water pressure is more than 490 kPa (4.9
Bars), it is recommended to use a pressure reducer before the unit.
5.
Close the main feed-water valve before
installation.
6.
Open the tap for connecting and remove the remaining water in
piping-system.
7.
Detach the faucet from the water pipe and connect the main water
adaptor to the water pipe.
8.
Connect the unit only to the cold water pipe. It is harmful for filters to
connect to hot water.
9.
Connect the inlet tube to the adaptor.
10.
Be sure that the inlet hose is not twisted or bended. It could cause
water and electric leakage.
WARNING:
If during the plug in, the Hot Water Switch was on then
the device will emit a thermostat. In such a case thermostat should
be reset. During reset the device should not be connected to the power
supply. Otherwise there a risk of electric shock.
1.2. After being sure that Hot and Cold water switches are off, connect
the unit to the electricity.
1.3. After connecting to the power, the unit will start to fill the tanks.
At this point before the tanks start to take water, do water flushing
process to each filter for mo e than 10 mins, until white, black or
bubble water doesn't come out from the fi lter. For sediment and
precarbon filter, disconnect them from the membrane and dump the
water for 10 mins.
For Alkaline Filter, disconnect it frrom the tank and dump the water
for 10 mins.
WARNING:
Even the filters are flushed, it is recommended to dump
the first 20 liters of water after the initial operation
1.1.Before supplying electric power to the unit, check that “Hot Water
Switch” and “Cold Water Switch” are both in closed position
Summary of Contents for FREZYA 600S Series
Page 2: ......
Page 4: ...CONTENTS NDEK LER...
Page 11: ...ENG 9 Description of Components Frezya 600S...
Page 29: ...TR 27 Frezya 600S Su Sebilinin Ayr nt l Profil...
Page 46: ...TR 44 Notlar...
Page 47: ......