Once demand is registered, the fan is started to vent any gases that may be present.
This phase is called pre-purge and lasts about 15 seconds.
The icon is activated.
The message PRE PURGE appears.
During the pre-purge, the pressure switch closes.
The icon is activated.
The message PRESSURE SWITCH appears.
This is then followed by the (pre-)glow of the hot surface igniter.
The icons and are dimmed
The icon is activated.
After a number of seconds pre-glow, the gas control valve is opened and ignition
takes place.
The icon is activated.
The message IGNITION appears.
After ignition, the flame is detected and the appliance will be running. This means
that actual heating has started:
The icon is dimmed.
The icon is activated.
The message RUNNING appears.
When the water is up to temperature, the heat demand ceases and the post-purge
starts. This takes about 25 seconds.
The icons , and are dimmed.
The icon is activated.
The message POST PURGE appears.
2.
-
-
3.
-
-
4.
-
-
5.
-
-
6.
-
-
-
7.
-
-
-
26
User part
Summary of Contents for BFC Cyclone
Page 6: ...6...
Page 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13...
Page 14: ...14...
Page 16: ...16 User part...
Page 18: ...18 User part...
Page 24: ...24 User part...
Page 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41...
Page 42: ...42 User part...
Page 46: ...46 Installation Maintenance and Service part...
Page 52: ...52 Installation Maintenance and Service part...
Page 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59...
Page 76: ...76 Installation Maintenance and Service part...
Page 78: ...78 Installation Maintenance and Service part...
Page 84: ...84 Installation Maintenance and Service part...
Page 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part...
Page 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part...
Page 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part...
Page 113: ......
Page 114: ......
Page 118: ...116 Installation Maintenance and Service part...