Figure 13.  Measuring Conveyor Chain

MAINTENANCE (continued)

Measure the Conveyor Chains for Stretch 

After a period of time, the conveyor links will wear and 

the conveyor will stretch.  This may cause the conveyor 

to jam as it rotates on the sprockets.  This is easily 

remedied by removing one or more links from each 

side of the conveyor.

NOTE:  This periodic adjustment  not covered 

under warranty.  It is a user responsibility.

  1.  Open the front and rear conveyor covers and set 

et the compression knobs to “6 & F”.

  2.  Facing the heel/club side (front), locate the 

approximate center point of the conveyor belt/

chain. 

  3.  Pull the conveyor chain away from the edge of 

the toaster.

  4.  Stand a U.S. Quarter coin (15/16”, or 2.5cm  

horizontally between the chain and the frame 

(Figure 13). 

NOTE:  The coin should fit securely between the 

chain and the frame.

  5.  If the gap is significantly wider than the coin (one 

and a half times as large) a small link will have to 

be removed from the conveyor chain.  

  6.  Disconnect the conveyor belt/chain by squeezing 

any two links together and unhooking both ends 

of one link (Figure 14).

NOTE: Needle nose pliers may be required. 

  7.  To shorten a stretched conveyor belt/chain, 

remove one 1/2” link from the conveyor belt. 

  8.  Reconnect by hooking both ends of the belt back 

together and remeasure accordingly. 

NOTE: If the belt is too short/tight to be reassem-

bled, remove an additional 1/2” link and install a 

3/4” link.  This will shorten the belt 1/4” overall.

  9.  Reassemble the conveyor chain and repeat the 

measurement.

NOTE:  If you CANNOT stand the coin between 

the chain and frame you have taken out the wrong 

sized link or have taken out too many links and 

damage may occur to the toaster.  

 10.  Repeat steps 3 through 7 for the crown (rear) 

side of the toaster using a U.S. Dime coin (11/16”, 

1.8cm).

Figure 14. Removing Conveyor Chain Link

Rotation

Upper Support Rod

Large Link 

P/N 0800121

Small Link 

P/N 0800204

CAUTION

Loose or over tightened conveyor  

chains can damage the toaster.

Summary of Contents for VCT-200 Series

Page 1: ...installation not to exceed 30 months from the date of shipment from our factory If any part becomes defective during the period of this Warranty Antunes Food Service will pay negotiated straight time...

Page 2: ...he same time Buns are placed into the bun feeder on the top of the toaster and uniform golden brown warm buns are then retrieved at the base of the toaster This manual provides the safety installation...

Page 3: ...nufacturing Number Voltage Wattage Amperage HZ Approximate Toasting Time in Seconds VCT 200RD 9200500 208 220 240 4185 4682 5570 20 1 21 3 23 2 60 17 VCT 200RR 9200502 208 220 240 4185 4682 5570 20 1...

Page 4: ...RAPID TOASTER VCT 200 4 P N 1010710 Rev N 02 13 McDonald s Dimensions SPECIFICATIONS continued Weights Lbs Kgs Net 95 43 1 Shipping 105 47 6...

Page 5: ...not allow cord to hang over edge of table or coun ter The following warnings and cautions appear throughout this manual and should be carefully observed Turn the unit off disconnect the power source...

Page 6: ...n doubt as to whether the appliance is properly grounded CAUTION Bread may burn Therefore toasters must not be used near or below curtains or other combustible walls and materials Failure to maintain...

Page 7: ...ater consists of a heating coil built into the platen to toast the cut side of the bun The two auxiliary heaters assist in providing additional heat to the buns The first auxiliary heater is located w...

Page 8: ...onds the display will revert back to the previous setpoint AUXILIARY HEATER TEMPERATURE ADJUSTMENT 1 Turn power on and wait for temperature display to finish the power up sequence Figure 4 3 4 2 Press...

Page 9: ...urn off electrical power to the con trol circuits if the unit overheats To reset this hi limit control allow sufficient time 10 15 minutes for the unit to cool down then depress the reset button locat...

Page 10: ...Board Call for Service Err 2 Failed Control Board Call for Service Err 3 The programming dip switches were not adjusted upon installation of the universal control board The dip switches must be adjus...

Page 11: ...remove the Groovy Belt Wrap from toaster 6 Plug in the power cord and turn the unit ON Count ten 10 seconds for 10 second toasters or seventeen 17 seconds for 17 second toasters Then turn the toaster...

Page 12: ...ths Replace Groovy Belt Wraps Clean and Measure Conveyor Belts Chains Check Roller Tensioners and Check Temperature of Bun Landing Area Remove the Groovy Belt Wraps Release Sheet 1 Turn the power On O...

Page 13: ...y wider than the coin one and a half times as large a small link will have to be removed from the conveyor chain 6 Disconnect the conveyor belt chain by squeezing any two links together and unhooking...

Page 14: ...avy side should be installed facing the outside of the toaster The flap should be in the down position Figures 15 17 3 Close the front and rear conveyor covers by lifting the covers and gently pushing...

Page 15: ...t or replace them accordingly If they have been damaged they should be replaced 1 Remove screws from acorn nuts Figure 20 and remove old roller tensioner assy Check the Temperature of the Bun Landing...

Page 16: ...cuit Breaker located at the store s power panel Contact your maintenance person or Authorized Service Agency for service Temperature display reads LO Platen temperature is below 420 F 216 C Allow thir...

Page 17: ...me coin 11 16 1 8 cm Roller Tensioner bent or missing I N G O D W E T R U S T L I B E R T Y 2 0 0 0 Adjust bent Roller Tensioner measured to 13 16 2 1 cm or the height of a U S Nickel coin from the bo...

Page 18: ...ver Assembly correctly according to the Maintenance section of this manual Buns are not toasting prop erly Compression Settings are incorrect Set the Bun Thickness Compression Controls to D 5 for 17 s...

Page 19: ...ing belt to pull buns across Platen in required time Clean or replace Groovy Belt Wrap Groovy Belt not Tacky Buns Sticking on Release Sheet Clean or replace Release Sheet Groovy Belts installed incorr...

Page 20: ...E C F CAUTION CAUTIO N Don not touch hot surfaces CAU TION PLATEN AUXILIARY P L A T E N A U X I L I A R Y 40 A T 39 38 L 4 76 75 80 T I S 73 72 U 71 74 52 53 54 57 T 51 11 M B 70 32 14 50 R 79 43 34...

Page 21: ...de to determine if the bun falls within the specific range QUARTER POUNDER HEIGHT 1 5 8 to 1 7 8 4 1 cm to 4 7 cm DIA 3 3 4 to 4 9 5 cm to 10 2 cm MIN HEIGHT MIN HEIGHT HEIGHT 1 1 2 to 1 3 4 3 8 cm to...

Page 22: ...P N 1010710 Rev N 02 13 McDonald s REPLACEMENT PARTS continued B F 20 42 8 O N Z 6 58 2 36 59 13 46 9 10 3 B 35 60 10 77 7 9 1 61 5 4 3 2 1 45 81 82 FF T L 89 B B 88 GG NOTE Hardware List for items A...

Page 23: ...l Dial Pack of 10 For 1 17 Second Toasters YELLOW in Color 10P1026 Label Dial Pack of 10 For 1 10 Second Toasters GRAY in color 39 2100253 Knob Control 2 40 7000232 Cover End 1 41 4050214 Thermocouple...

Page 24: ...1 X 331P103 Shoulder Bolt 5 16 18 x l 1 Y 040P111 Bushing Shorty 1 2 1 not shown Z 306P105 Screw 6 32 x 1 2 1 BB 331P106 Lockwasher 5 16 1 CC 212P118 Flat Washer 5 16 1 DD 331P101 Nut Hex 5 16 x 18 1...

Page 25: ...RAPID TOASTER VCT 200 25 P N 1010710 Rev N 02 13 McDonald s WIRING DIAGRAMS Pictorial Wiring Diagram...

Page 26: ...RAPID TOASTER VCT 200 26 P N 1010710 Rev N 02 13 McDonald s HI LIMIT CONTROL Ladder Wiring Diagram...

Page 27: ...RAPID TOASTER VCT 200 27 P N 1010710 Rev N 02 13 McDonald s NOTES...

Page 28: ...RAPID TOASTER VCT 200 28 P N 1010710 Rev N 02 13 McDonald s NOTES...

Reviews: