
Page 24
We take care of it.
The longitudinal stabilization rail
(5) is inserted obliquely into the
provided holders in the side walls
(1).
Press both side walls slightly in-
wards until the stabilization rail
engages, then place the side walls
outwards.
The base already has a good stabil-
ity for further installation.
The longitudinal stabilization rail is
only for the construction of the
bas and must be removed before
inserting the transformer-block.
Insert the front and rear panels (2)
at an angle into the side panels (1),
fold them in and press them down.
Proceed according to the same
principle for the top rear panel (4)
and the top front panel.
Then press two locking slides out-
wards into each of the side walls.
Note: the top front wall has no
locking slides!
Insert the fixing rail (7) to secure
the cabinet in the two holders on
the side walls (1).
If necessary, insert the supplied
fastening nuts (10) for PEN bus bar
fastening.
Squeeze the blind plug for con-
struction site closure (8) together,
turn it 90°C and remove it from the
side panel (1).
Push in the s6train relief (12) from
above until it engages. Insert the
cable (13) and tighten the two
clamping screws (14).