49
12.8.1. Unloading the 3M™ Steri-Vac™ Sterilizer/Aerator GS Series – Cycle Complete
Sterilizer
55.0
˚
C
98.0
kPa
Stop
Aeration time elapsed (hh:mm):
Cycle complete
0:00
1:00
12:00
Menu
Menu
04/20/2015
21:04:01
Gas expose time elapsed (hh:mm):
Cycle time remaining (hh:mm):
Cycle:
Count:
33
55
˚
C
Open door
Show chart
Figure 57.
Cycle Complete Screen
1.
Press the
Open Door
button on the touch screen (Figure 57). On double door units, press the
Open Unload Door
button. The Load Door cannot be opened after the cycle has successfully
completed on double door units.
2.
Allow chamber pressure to equilibrate to room pressure; this typically requires 60-90 seconds.
3.
Open the GS Series sterilizer door.
4.
Remove the load from the chamber. Remove the empty 3M™ Steri-Gas™ EO Gas Cartridge.
5.
Press the
Stop
button to generate a printout of the cycle report (Figure 58). The display will return to the main screen.
6.
Follow the Process Monitoring and Quality Control procedures described in Chapter 13.
Sterilizer
22.2
˚
C
98.0
kPa
Stop
Aeration time elapsed (hh:mm):
Cycle complete
0:00
1:00
12:00
Menu
Menu
04/20/2015
21:03:12
Gas expose time elapsed (hh:mm):
Cycle time remaining (hh:mm):
Cycle:
Count:
33
55
˚
C
Open door
Show chart
Press Stop to Obtain a
Printout Cycle Report
Figure 58.
Command to Obtain Cycle
Report Printout
Summary of Contents for Steri-Vac GS Series
Page 1: ...3M Steri Vac Sterilizer Aerator GS Series Operator s Manual ...
Page 2: ......
Page 66: ......
Page 67: ......