9
Installation and Set-Up
(Continued)
Figure 2-5 – Air Control Unit – Set-Up
Tape Drum - Bracket Assembly
The tape drum bracket is supplied with two
#10-24 x 1/2 lg mounting screws. Assemble the
bracket to the machine and the tape drum to the
bracket.
1.
Attach the tape drum bracket (E) to the rear of
the machine with two #10-24 x 1/2 lg soc hd
capscrews as shown in Figure 2-4.
2.
Assemble the tape drum/backup plate (D) to the
bracket (E) and adjust tape drum/backup plate in
or out to obtain the 1-11/16 inch [43 mm]
clearance between backup plate and bracket as
shown in Figure 2-4. Secure this setting with the
1/2-13 jam nut (F).
Tape Loading and Threading
See "Operation", page 15.
5.
The lubricator oil metering adjustment knob,
shown in Figure 2-5, has been preset open
two turns. If excessive oil becomes visible at
the exhaust mufflers, close adjustment knob
clockwise 1/4 turn or until one drop/60cycles is
visible in the sight glass, shown in Figure 2-5.
If lubricator does not use oil, open adjustment
knob counterclockwise 1/4 turn or until one
drop/60 machine cycles is visible.
Summary of Contents for 3M-Matic S-857
Page 25: ...22 THIS PAGE IS BLANK ...
Page 27: ...24 Figure 8 1 Main Frame Nest Covers ...
Page 28: ...25 Figure 8 2 Tape Drum Tape Feed Jaw Assemblies ...
Page 29: ...26 Figure 8 3 Tape Feed Assembly ...
Page 30: ...27 Figure 8 4 Jaw Assembly ...
Page 31: ...28 Figure 8 5 Cut Off Buffing Assemblies ...
Page 32: ...29 Figure 8 6 Cut Off Assembly ...
Page 33: ...30 Figure 8 7 Buffing Assembly ...
Page 34: ...31 Figure 8 8 Pneumatic Components ...
Page 35: ...32 Figure 8 9 Pneumatic Components ...
Page 43: ...40 THIS PAGE IS BLANK ...