02.0 What is a Facility Requirements Guide
This guide provides important information on selecting a facility location and planning for the installation of 3D Systems' ProJet™ 7000. It also
presents planning guidelines to facilitate fast, convenient installation and operation of your modeler.
What's Inside:
A description of hardware, software, networking components, and documentation that comprise the ProJet™ 7000.
An overview of the site requirements and recommendations in typical engineering and design work spaces. These involve basic access,
electrical, and environmental considerations for configuring a safe and efficient work area.
A checklist is included to ensure that the facility is adequately prepared for installation of your modeler.
Information on how to obtain assistance from 3D Systems Customer Support Team.