
05.5 Electrical Requirements
Power Requirements
Voltage
Current
Frequency
Phase
100 VAC
15 amps
50/60 Hz
1 phase
115 VAC
15 amps
50/60 Hz
1 phase
230 VAC
8 amps
50/60 Hz
1 phase
The system requires a dedicated, surge- and spike-protected circuit. Use of an Uninterruptible Power Supply (UPS) is strongly recommended in
areas where power fluctuations are frequent, as surges and spikes can cause damage to electronic components and loss of power can result in
failed builds.
Surge and spike suppression should carry a rating of at least 1,000 joules with a clamping voltage of approximately 300V. Uninterruptible power,
recommended especially in areas where circuits may be affected by lightening strikes, should be rated for 3kVA at a minimum.
For specific information on a suitable UPS, contact a UPS manufacturer and provide the voltage rating, current draw, and desired backup time.
The manufacturer will be able to recommend an appropriate model.
ProJet™ 7000 System Power Connection Requirements
In the United States, a dedicated circuit to a standard 15 amp wall outlet is required. The system connects to a 115VAC power outlet
through a standard 115VAC power cord.
In Europe, a dedicated circuit to a standard 10 amp wall outlet is required. The system connects to a 230VAC power outlet through a
standard 230VAC power cord. Country destination kits are available with the proper wall power connections.