3D Platform
WorkSeries 200, 300 & 400 Manual
Revision: B
Date: December 28, 2017
3dplatform.com
• 3DP
-DOC-005 (12-2017)
13
Initial Actuator Alignment
Prior to powering up the machine, move the Y axis to
the end of the build area, as shown. Gently push both
sides
simultaneously
so the actuators move smoothly
until they reach the end. This will eliminate any racking
or misalignment.
Note:
Initial alignment of the actuators must be completed prior to powering
up. Racking of linear motion actuators can cause serious damage or breakage
to mechanical hardware and/or brackets on the 3D Platform WorkSeries
printer.
Wiring Connections & Setup
1. Locate the Control Unit
The control unit is stored within the storage drawers for
initial shipment. Unpack the unit and place it on the
front work area of the base unit.
2. Attach Wiring to the Control Unit
Match each 15 pin D-Sub connector with the
corresponding plug on the control box. See diagram
below for reference.
Note:
Misconnection of harnesses can result in damage to the Control
Box. Ensure proper mating of the connectors and that the labels
match upon installation.