
1-18
C
HAPTER
1: NETB
UILDER
II 4-S
LOT
B
RIDGE
/R
OUTER
10
Reinstall the cover.
a
Position the cover slightly behind the front of the chassis.
b
Lower the cover and slide it toward the front of the chassis so that it
engages the front panel.
c
Secure the cover with the screws you removed earlier from the back and
sides of the chassis.
11
If your system was previously mounted in a rack, reinstall the rack-mount
brackets on the chassis and remount the system.
12
Make sure the power switch is off (O is pressed down). Plug the power cord
into the power supply and power outlet.
13
Turn on the system.
Summary of Contents for NETBuilder II
Page 8: ...viii ...
Page 10: ...2 ABOUT THIS GUIDE ...
Page 46: ...2 18 CHAPTER 2 NETBUILDER II 8 SLOT BRIDGE ROUTER ...
Page 66: ...3 20 CHAPTER 3 NETBUILDER II 8 SLOT EXTENDED BRIDGE ROUTER ...
Page 72: ...A 6 APPENDIX A FEATURE SUMMARY AND SPECIFICATIONS ...
Page 82: ......