
Checking the LEDs
13
Connecting Devices to
the Network Jack
After the Network Jack is installed and mounted, connect your networking devices
(such as computers, printers, etc.) to any of the four switched ports on the front of
the Network Jack.
If you installed the adapter plate with pass-through ports, connect the appropriate
device(s) to the port(s).
Checking the LEDs
You can verify the Network Jack installation by checking the LEDs.
Additionally, each of the switched ports has a green LED which lights when a
device is connected. Port #1 also has an amber LED which lights when the
Network Jack is forwarding power to a connected device.
LED
Description
(LAN)
n
On—The Network Jack is connected to the network and a link
has been established.
n
Off—There is no connection to the network.
(Power)
n
On—The Network Jack is receiving power (local or via the
network). When you first connect power to the Network Jack,
there will be a delay of approximately 5 seconds. The power LED
light will blink once or twice before remaining solid on.
n
Off—The Network Jack is not receiving power.
Summary of Contents for IntelliJack NJ200
Page 4: ......
Page 18: ...14 CHAPTER 1 INSTALLING THE NJ200 NETWORK JACK ...
Page 24: ...20 CHAPTER 2 INSTALLING THE CONFIGURATION MANAGERS ...
Page 28: ...24 CHAPTER 3 USING THE LOCAL CONFIGURATION MANAGER ...
Page 54: ...Technical Support 50 ...
Page 58: ......