474
C
HAPTER
22: F
ILE
S
YSTEM
M
ANAGEMENT
6
Sending the Information to SNMP
Table 528
Sending the Information to SNMP
7
Turn on/off the information synchronization Switch in Fabric
Figure 124
Turn on/off the Information Synchronization Switch in Fabric
Sending the Information
to Loghost
To send information to the loghost, follow the steps below:
1
Enabling info-center
Perform the following operation in System View.
Table 529
Enable/Disable Info-Center
Info-center is enabled by default. After info-center is enabled, system performances
are affected when the system processes much information because of information
classification and outputting.
2
Configuring to output information to loghost
Perform the following operation in Table 530.
Device
Configuration
Default value
Configuration description
Switch
Enable info-center
By default,
info-center is
enabled.
Other configurations are valid only
if the info-center is enabled.
Set the information output
direction to SNMP
-
-
Set information source
-
You can define which modules and
information to be sent out and the
time-stamp format of information,
and so on. You must turn on the
Switch of the corresponding
module before defining output
debugging information.
Configuring SNMP features -
See RMON Configuration
Network
management
workstation
The same as the SNMP
configuration of the Switch
-
-
Device
Configuration
Default Value
Configuration Description
Switch
Enable info-center
By default, info-center is
enabled.
Other configurations are valid
only if the info-center is
enabled.
Set the information
output direction to
SNMP
By default, Switches of master
log in Fabric, debugging and trap
information synchronization are
turned on, so as log and strap
information synchronization
Switches in other Switches.
This configuration can keep
log information, debugging
information and trap
information in Fabric in every
Switch synchronized.
Operation
Command
Enable info-center
info-center enable
Disable info-center
undo info-center enable
Summary of Contents for 5500 SI - Switch - Stackable
Page 24: ...24 ABOUT THIS GUIDE...
Page 50: ...50 CHAPTER 1 GETTING STARTED...
Page 54: ...54 CHAPTER 2 ADDRESS MANAGEMENT CONFIGURATION...
Page 78: ...78 CHAPTER 3 PORT OPERATION...
Page 88: ...88 CHAPTER 4 XRN CONFIGURATION...
Page 122: ...122 CHAPTER 8 VLAN VPN CONFIGURATION...
Page 216: ...216 CHAPTER 15 SSH TERMINAL SERVICES...
Page 268: ...268 CHAPTER 16 IP ROUTING PROTOCOL OPERATION...
Page 308: ...308 CHAPTER 17 NETWORK PROTOCOL OPERATION...
Page 349: ...349...
Page 350: ...350 CHAPTER 18 MULTICAST PROTOCOL...
Page 522: ...522 CHAPTER 22 FILE SYSTEM MANAGEMENT...
Page 584: ...584 CHAPTER 30 PASSWORD CONTROL CONFIGURATION OPERATIONS...
Page 600: ...600 CHAPTER 31 MSDP CONFIGURATION...
Page 614: ...614 CHAPTER 32 CLUSTERING...
Page 670: ...670 CHAPTER C AUTHENTICATING THE SWITCH 5500 WITH CISCO SECURE ACS...