42
C
HAPTER
4: S
TART
THE
S
WITCH
If you power on a power supply and it is not
operating, the Character Display displays the
following:
PWR x
.
Where
x
is the number of the power supply that is not
operating. The installed switch fabric module Status
LED flashes green.
When the power-on phase has completed
successfully, normal operation begins and switch
fabric module Status LEDs stop flashing and remain a
steady green.
If one of the power-on diagnostic tests fails, then the
switch fabric module Status LED turns a steady
yellow.
The switch displays the following message when the
management module is installed properly and the
RS-232 connection is made:
CoreBuilder 9000 Enterprise Management Engine
(vx.xx)
Copyright (c) 1999 3Com Corporation.
Login:
The Switch 4007 software and management
interfaces are based on CoreBuilder® 9000 switch
technology. In Switch 4007 software releases 3.0.0
and 3.0.5, the prompts and displays in all interfaces
may indicate this heritage.
To continue operating and configuring your Switch,
see the
Switch 4007 Implementation Guide
and
Switch 4007 Command Reference Guide
.
Where to Go from Here
To verify that the Switch 4007 chassis and all modules
have been installed correctly, examine the LED status
on each module. To obtain information about a
module’s LEDs and status indicators, see the
User
Guide
,
Getting Started Guide
,
or
Quick Start Guide
for that module.
For detailed information about the tasks that are
listed in Table 9, see the
Enterprise Management
Engine Quick Start Guide
.
Table 8
Tasks to Perform After You Power On the Switch
Task
Description
Configure the
Enterprise
Management
Engine
To configure the EME, set:
■
Terminal settings
■
Time and date
■
Device (Contact, Diagnostics, Location,
and Name)
■
SNMP parameters to enable network
access
■
Mastership priority, if you have two EMEs
Connect to a
terminal or a
modem
To configure and monitor your Switch, con-
nect a PC, terminal, or modem to the EME
console port.
You can manage your switch locally through
a terminal connection or remotely using a
Telnet or modem connection.
Perform initial
management
access
Initially you access the switch through the
RS-232 port.
With network access, you can manage the
Switch 4007 from a remote terminal or
SNMP manager.
Summary of Contents for 3CGBIC97 - Switch 4007 70km Gigabit Enet Gbic
Page 1: ...http www 3com com 3Com Switch 4007 Getting Started Guide Part No 10013650 Published May 2000 ...
Page 6: ......
Page 18: ...18 CHAPTER 1 ABOUT THE SWITCH 4007 ...
Page 28: ...28 CHAPTER 2 SWITCH 4007 MODULES ...
Page 40: ...40 CHAPTER 3 INSTALLING THE SWITCH 4007 ...
Page 66: ...66 APPENDIX A SPECIFICATIONS ...
Page 76: ...76 APPENDIX C TECHNICAL SUPPORT ...
Page 84: ...84 GLOSSARY ...
Page 88: ...88 INDEX ...
Page 92: ......