
30
30
8. FIRST USE
Before putting the air curtain into operation:
•
Make sure that any tools or other objects that could damage the air curtain didn’t remain in the air curtain.
•
Make sure that the electric power supply, regulation and inlet of heating water are properly supplied.
•
Make sure that the air curtain is properly covered.
•
Become familiar with the instructions of all used components.
Before putting the air curtain into operation, carefully read all the instructions for all components used in the
system.
Test the regulation of the fan
•
Test the accuracy of the direction of fan rotation
•
Test the accuracy of the range of speed regulation
•
Test the fan behavior when using external elements
Test the regulation of electric heating
•
Test the functionality of the range of the heater’s regulation
•
Test the behavior of the heater when using external control elements
Test the regulation of water heating
•
Test the functionality of the range of the heater’s regulation
•
Test the behavior of the heater when antifreeze protection is activated
•
Test the behavior of the heater when using external control elements