background image

FV454 Rev C   1/28/13
Page 2

PRIOR TO INSTALLATION

Prior to installing the ZEG EcoVantage urinal flushometer
valve, install the items listed below:
• Urinal fixture
• Drain line
• Water supply line

1.) 

Install stop valve assembly 

(A)

 using proper size supply

escutcheon and sweat solder adapter kit if applicable.

Note: Thread sealing compounds should be avoided.
Recommend teflon tape to seal NPT only.

3.) 

Prior to inserting the flush valve tailpiece 

(B)

 into stop valve

(A)

, be certain that the O-ring seal 

(C)

 is located in O-ring

seal groove at the end of the tailpiece and that the locking
nut 

(D) 

and locking snap ring 

(E)

 are located as shown.

Care should be taken not to damage the O-ring when
inserting the tailpiece into the stop valve. If lubrication is
needed, wetting the O-ring with water will be sufficient.

1

3

E

C

A

D

B

Before the supply water is turned on, be sure all stop valves
are closed off tight. The stop valves can be opened and closed
by using the adjusting screw 

(S)

 located at the center of the

stop valve cap 

(T)

. Stop valve adjustments can only be made

by using the adjusting screw 

(S)

It is not necessary to re-

move the stop valve cap (T) when making adjustments. If
for any reason it becomes necessary to remove the stop
valve cap (T), be certain the water is shut off at the main
supply valve.

T

2

2.) 

When all stops are connected to the water supply and

water pressure is available, it is recommended that the
supply piping be flushed to remove dirt, metal chips, etc.,

from system.

A. Before the valve is installed, open each stop fully for a brief

time and catch the water in a two gallon or larger bucket.
For multiple installations, start with the stop valve closest
to the water supply and work toward the most remote valve.

B. Due to the small passages and orifices, it is not possible

to flush the piping through the low volume valve.

C. Once the lines are flushed, the valve can be installed.

S

A

2

IMPORTANT:

• All Plumbing is to be installed in accordance with applicable

codes and regulations.

• Water supply lines must be sized to provide an adequate

volume of water for each fixture.

• Flush all water lines prior to operation (See Step 2).
• Dirt and debris can cause flush valve to run continuously.
• Sensor units should not be located across from each other

or in close proximity to highly reflective surfaces.

• DO NOT use pipe dope or plumbers grease on any part or

connection of this valve.  These materials can block small
orifices in the flush valve and cause malfunctions.

The ZEG is designed to operate with 20 to 120 psi (138 to
827 kPa) of water pressure, however the required water pres-
sure is determined by the fixture.  Contact the fixture manu-
facturer for the proper static and flow operating pressures.
Protect the chrome or special finish of this flushometer. 

Do

not use toothed tools to install or service the valve.

Содержание ZEG6003EV

Страница 1: ...charges or any loss injury or damages whatsoever including incidental or consequential damages The sole and exclusive remedy shall be limited to the replacement of the defective goods Before installation and use the purchasershalldeterminethesuitabilityoftheproductforhisintendeduseandthepurchaserassumesallriskandliability whateverinconnectiontherewith Where permitted by law the implied warranty of...

Страница 2: ... stops are connected to the water supply and water pressure is available it is recommended that the supply piping be flushed to remove dirt metal chips etc from system A Before the valve is installed open each stop fully for a brief time and catch the water in a two gallon or larger bucket For multiple installations start with the stop valve closest to the water supply and work toward the most rem...

Страница 3: ...tall the AA cell batteries provided Remove the battery box cover screw using the 1 8 allen wrench provided Turn the top assembly upside down and the screw will drop down and can be used to pull the cover off Load the four heavy duty AA alkaline batteries following the battery orientation guide on the battery box cover Note that the coil springs always contact the flat negative end of the battery I...

Страница 4: ... the magnet and stand in front of sensor about 20 away for the rest of the calibration The calibration process takes about 60 seconds Do not move during this process 4 When calibration is completed the solid red light will dis appear and the LED will blink twice brightly 8 9 LOW BATTERY WARNING The LED will double flash every 30 seconds when the bat teries reach a predetermined depletion level The...

Страница 5: ...e detected Run through reset procedure below Hold hand close to lens to see if it will produce the 4 flash 2 flash pattern Close stop disconnect valve crack stop to check for water Close stop remove and inspect filter Check stop screw Check solenoid leads and insertion of solenoid plug Remove solenoid and inspect diaphragm and plunger Visual inspection Remove solenoid and inspect diaphragm and plu...

Страница 6: ...41 3 4 Spud Friction Washer 42 3 4 Spud Sleeve 43 3 4 Spud Escutcheon 44 Setscrew for Control Stop Cover 45 Vandal Resistant Control Stop Cover 46 Stop Cap 47 Adjusting Screw 48 Guide Holder 49 Piston Guide 50 Guide O Ring 51 Piston 52 Piston Seal 53 Stop Body 54 Sweat Solder Adapter 55 Supply Cover Tube Flush Connections and Spud Coupling Kits Product No 3 4 Flush Connection and Spud Coupling Ite...

Отзывы: