PRIOR TO INSTALLATION
Prior to installing the ZEG EcoVantage urinal flushometer
valve, install the items listed below:
• Urinal fixture
• Drain line
• Water supply line
• Electrical wiring to the power converter (120 VAC, 35
watts service required for each power converter used)
IMPORTANT:
• All electrical wiring is to be installed in accordance with
National/Local codes and regulations.
• All Plumbing is to be installed in accordance with applicable
codes and regulations.
• Water supply lines must be sized to provide an adequate
volume of water for each fixture.
• Flush all water lines prior to operation (See Step 2).
• Dirt and debris can cause flush valve to run continuously.
• Sensor units should not be located across from each other
or in close proximity to highly reflective surfaces.
The ZEG is designed to operate with 20 to 80 psi (138 to 552 kPa) of water pressure. Protect the chrome or special finish of
this flushometer. Do not use toothed tools to install or service the valve.
2.) Install stop valve assembly (A) using proper size supply escutcheon and sweat solder adapter kit if applicable. Thread
sealing compounds should be used on male NPT threads only.
Figure 2
A
Before the supply water is turned on, be sure all stop valves are closed off tight. The stop valves can be opened and closed by
using the adjusting screw (S) located at the center of the stop valve cap (T). Stop valve adjustments can only be made by using
the adjusting screw (S). It is not necessary to remove the stop valve cap (T) when making adjustments. If for any reason it
becomes necessary to remove the stop valve cap (T), be certain the water is shut off at the main supply valve.
T
Figure 3
S
INSTALLATION
1.) Install the Zurn Power Converter in a convenient location
near the flush valve, mounted in a 4 x 4 electrical box in
accordance with local electrical codes. An optional mini
junction box (P6000-MJ) is recommended to distribute
power to multiple Pint Urinal Valves.
NOTE: One Power Converter can operate up to eight Pint
Urinal Valves. For wiring from the Power Converter to the Pint
Valve(s), use #18 AWG (by others). Do not supply power to
the Power Converter until installation of valve is completed
and checked.
Proper polarity must be observed or damage to one or all
components will result.
Optional Mini Junction Box
When using optional mini junction box, be certain power is off
while making wire connections to prevent damage to electri-
cal components.
Figure 1