background image

PRIOR TO INSTALLATION

Prior to installing the ZEG EcoVantage urinal flushometer
valve, install the items listed below:
• Urinal fixture
• Drain line
• Water supply line
• Electrical wiring to the power converter (120 VAC, 35
  watts service required for each power converter used)

IMPORTANT:
• All electrical wiring is to be installed in accordance with

National/Local codes and regulations.

• All Plumbing is to be installed in accordance with applicable

codes and regulations.

• Water supply lines must be sized to provide an adequate

volume of water for each fixture.

• Flush all water lines prior to operation (See Step 2).
• Dirt and debris can cause flush valve to run continuously.
• Sensor units should not be located across from each other

or in close proximity to highly reflective surfaces.

The ZEG is designed to operate with 20 to 80 psi (138 to 552 kPa) of water pressure.  Protect the chrome or special finish of
this flushometer. Do not use toothed tools to install or service the valve.

2.)  Install stop valve assembly (A) using proper size supply escutcheon and sweat solder adapter kit if applicable.  Thread

sealing compounds should be used on male NPT threads only.

Figure 2

A

Before the supply water is turned on, be sure all stop valves  are closed off tight. The stop valves can be opened and closed by
using the adjusting screw (S) located at the center of the stop valve cap (T). Stop valve adjustments can only be made by using
the adjusting screw (S)It is not necessary to remove the stop valve cap (T) when making adjustments. If for any reason it
becomes necessary to remove the stop valve cap (T), be certain the water is shut off at the main supply valve.

T

Figure 3

S

INSTALLATION
1.)
 Install the Zurn Power Converter in a convenient location

near the flush valve, mounted in a  4 x 4 electrical box in
accordance with local electrical codes.  An optional mini
junction box (P6000-MJ) is recommended to distribute
power to multiple Pint Urinal Valves.

NOTE:  One Power Converter can operate up to eight Pint
Urinal Valves.  For wiring from the Power Converter to the Pint
Valve(s), use #18 AWG (by others).  Do not supply power to
the Power Converter until installation of valve is completed
and checked.
Proper polarity must be observed or damage to one or all
components will result.

Optional Mini Junction Box
When using optional mini junction box, be certain power is off
while making wire connections to prevent damage to electri-
cal components.

Figure 1

Содержание AquaSense EV ZEG Series

Страница 1: ...be responsible for any labor charges or any loss injury or damages whatsoever including incidental or consequential damages The sole and exclusive remedy shall be limited to the replacement of the defective goods Before installation and use the purchasershalldeterminethesuitabilityoftheproductforhisintendeduseandthepurchaserassumesallriskandliability whateverinconnectiontherewith Where permitted b...

Страница 2: ...uld be used on male NPT threads only Figure 2 A Before the supply water is turned on be sure all stop valves are closed off tight The stop valves can be opened and closed by using the adjusting screw S located at the center of the stop valve cap T Stop valve adjustments can only be made by using the adjusting screw S It is not necessary to remove the stop valve cap T when making adjustments If for...

Страница 3: ...s installed open each stop fully for a brief time and catch the water in a two gallon or larger bucket Figure 3 For multiple installations start with the stop valve closest to the water supply and work toward the most remote valve B Due to the small passages and orifices it is not possible to flush the piping through the low volume valve C Once the lines are flushed the valve can be installed A 4 ...

Страница 4: ...ll activate This six second sensing cycle will prevent the valve from flushing needlessly when someone walks by If special circumstances require adjustment of the sensing distance see Appendix A Changing Activation Distance L D H G 9 Wiring installation see fig 8 A Remove the two cover retaining screw and lift the flushometer top cover B Run fish tape through the valve cover tube and wall to the p...

Страница 5: ...as follows 1 Place the Zurn Magic Magnet N on the left hand side of the flat top surface of the valve and move around until the LED comes on 2 The LED will blink 10 times to indicate magnet is in the proper position Hold magnet in place until 10 flashing lights occur and the red light turns solid The solid red light indi cates the electronics are in calibration mode 3 Remove the magnet and stand i...

Страница 6: ...or water Close stop remove and inspect filter Check stop screw Check solenoid leads and and insertion of solenoid plug Visual inspection Check for leak location Check for cuts Solution Reduce sensing range Eliminate reflective object Replace if obstructed or damaged Reinsert plug or repair leads Replace Reset sensor range AppendixA Find source valve and turn on Clean and reinstall filter Open stop...

Страница 7: ...ng Screw 31 Guide Holder 32 Piston Guide 33 Guide O Ring 34 Piston 35 Piston Seal 36 Stop Body 37 Sweat Solder Adapter 38 Supply Cover Tube 39 Setscrew for Cast Wall Escutcheon 40 Cast Wall Escutcheon 41 Hex Wrench 42 Cover O ring Control Stop Repair Kit and Parts Product No Control Stop Repair Kit for 3 4 PEG6003 D SD Includes Items 30 35 3 4 Control Stop Replacement Includes PEG6003 C SD Items 2...

Отзывы: