Equipment Installation
ZXR10 3900A/3200A series switches can be placed on desks or
fixed in 19-inch standard cabinets.
Where, the 19-inch standard cabinet can be provided by the user.
If ZTE's cabinet is to be used, you need refer to the 19-Inch Stan-
dard Cabinet Installation Manual for cabinet installation.
Desktop Installation
Install four plastic bottom blocks (plastic bottom blocks are strews
are provided together with device) on the bottom plate of switch
to form an air passage, for which heat generated by power module
can be dissipated efficiently. For the installation method, refer to
.
F
IGURE
34 INSTALLING PLASTIC PADS
1.
Case
2.
Pad