
07 - 10
RT75 Rough Terrain Crane
You must open the shutoff gate valve before you engage the PTO. You can
cause damage to the hydraulic system if the valve is closed when you
engage the PTO.
(c) Engage the PTO.
(d) The PTO handle is located near the superstructure. Pull the handle up to
engage the PTO. Refer to Figure 07
–
2.
Figure 07
–
2 Engage PTO Handle
Run the engine for 15 min to 20 min in winter before lift a load.
(3) Disengage the PTO.
Push down the PTO handle to disengage the PTO. Refer to Figure 07
–
3.
Figure 07
–
3 Disengage PTO Handle
Caution
Warning
Содержание RT75
Страница 2: ...RT75 ROUGH TERRAIN CRANE OPERATOR S MANUAL Edition 1 Dec 2013...
Страница 3: ......
Страница 8: ......
Страница 9: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 19: ...03 2 RT75 Rough Terrain Crane MAINTENANCE LOG Item Adjusting Condition Date...
Страница 22: ......
Страница 23: ......
Страница 32: ...RT75 Rough Terrain Crane 04 9 1 Figure 04 2 Danger Crush Hazard 2 Figure 04 3 Danger Electrocution Hazard...
Страница 33: ...04 10 RT75 Rough Terrain Crane 3 Figure 04 4 Hand Signals for Crane Operation...
Страница 34: ...RT75 Rough Terrain Crane 04 11 4 Figure 04 5 Danger Explosion Burn Hazard 5 Figure 04 6 Danger Crush Hazard...
Страница 38: ......
Страница 39: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 83: ...06 28 RT75 Rough Terrain Crane Figure 06 23 Engine Warning Figure 06 24 Transmission Warning...
Страница 89: ...06 34 RT75 Rough Terrain Crane Figure 06 34 Transmission History Warning Figure 06 35 About...
Страница 92: ......
Страница 93: ......
Страница 138: ...07 48 RT75 Rough Terrain Crane Figure 07 48 Figure 07 48 Offset Positions...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 163: ...09 2 RT75 Rough Terrain Crane Table 09 2 Liquid Weights and Measures Table 09 3 Metric Equivalents...
Страница 169: ...09 8 RT75 Rough Terrain Crane Figure 09 1 Overall View RT75 Rough Terrain Crane...
Страница 178: ...RT75 Rough Terrain Crane 09 17 Emergency Stop Button Winch Speed Sensor...