background image

7

© Copyright 2020 Zoeller

®

 Co. All rights reserved.

Operation

GENERAL

Zoeller pumps are lubricated and tested at the factory prior to shipment and 

require minimum pre-start-up maintenance.

Maximum liquid temperature of a continuous operating pump liquid for standard 

model pumps must not exceed 104 °F (40 °C). For longest service life all pumps should 

be totally submerged on long pumping cycles. Maximum submerged depth is 50'.

These units are not designed to handle liquids other than water or sewage. If 

pump is used in water contaminated with heavy, viscous, or abrasive materials, 

the warranty will be voided.

NAMEPLATE DATA

The nameplate, located on the top of pump, indicates specific information about 

the construction of the pump. The model number, date code, and serial number  

information should be recorded on the front page in the “Owner’s Information” 

section of this manual.

   

 

If the pump is repaired in th field, its explosion

   

 

proof rating may be voided.

SHORT TERM STORAGE

If pump is to be stored, the following is advised:

•  Store pump inside whenever possible or cover with some type of protective covering.

•  Tape or seal in plastic bag the terminal ends of wire leads.

•  Pump is to be stored in an upright position. Seal leaks that occur in storage 

to a pump laying on its side will not be repaired under warranty.

•  The impeller should be rotated every six months in order to keep the seals 

lubricated and not develop a permanent set.

If panel is to be stored, the following is advised:

•  Store the panel inside whenever possible and leave in the shipping 

box.

•  All openings shall be sealed.

•  Store in an upright position.

•  Do not stack anything on top of panel.

START-UP PROCEDURE

Before placing the equipment into operation the following should be checked:

•  Correct pump rotation (3 Phase units only).

•  Clean pit.

•  Panel dry, securely installed and properly sealed.

•  Floats positioned properly.

•  Discharge valves open.

•  3/16” vent hole drilled in pipe between check valve and pump.

Once the above has been verified proceed with the following checks:

•  Pump power cables properly connected to panel.

•  Float cables properly connected in an intrinsically safe panel.

•  Conduit connections to panel are properly sealed.

•  Thermal overload adjustments made in the panel.

•  After installing the pump into the containment area, with adequate submer-

gence, open the discharge valve fully. Start the unit using manual controls. 

If flow is appreciably less than rated performance, pump may be air locked. 

To expel trapped air, jog the unit several times, using the manual controls.

•  Have a qualified electrician take voltage and current measurements on the 

black wire of single phase or all three power wires of three phase with the 

pump running. Record these readings in the space provided in the 

“Owner’s 

Information”

 section on page 1 of this manual for future reference. 

After the preoperational functional test has been completed, system is ready for 

operation. Zoeller requires completing a Start-up Report (ZM1074) whenever a 

system is started for the first time or after a system has had a significant change 

take place (i.e. pump replacement, overhaul, etc..). A copy of the Start-up Report 

should remain with the system for future reference.

ADJUSTMENT PROCEDURE

Pumps:  No adjustments are required other than assuring correct rotation.

Panels:  The thermal overloads in the panel  must be set to the F.L.A. rating 

on the pump nameplate (or refer to pump data sheet).

Floats:   Refer to the system drawing for desired location of each float function.

Valves:  Discharge valves should be placed in the fully open position. Systems 

should not be operated for extended periods of time with the discharge 

valves partially closed due to damaging the valve.

SHUTDOWN PROCEDURES

If a system is shutdown for more than six months, the following is recommended:

Pumps:  If pit is to remain dry, then the pump can remain in the pit. With the 

pump in the pit, it should be operated for five minutes once every three 

months. If the pit is to remain wet, the pump should be removed and 

stored as noted above.

Panels:  The panel should have all openings sealed to prevent moisture and dust 

from entering the enclosure. Prior to restarting system, the panel should 

be inspected for presence of moisture and any loose connections.

Valves:  Consult the valve/actuator supplier for information concerning these 

systems components.

Maintenance

  Repair and service must be performed by a firm approved by 

Zoeller Company. The firm must be certified to work on explosion proof motors 

if motor housing, adapter or cord cap is repaired. Contact Zoeller Technical 

Service Department regarding warranty issues.
    

 

If repair to the motor housing, adapter or cord cap is disas-

sembled or repaired by a firm not certified to work on explosion proof motors, the 

explosion proof rating is void and the cCSAus approval tag 

MUST BE REMOVED 

FROM THE PUMP.SAFETY PROCEDURES.

 For your protection, always disconnect pump and panel from 

its power source before handling.

 Never enter the basin until it has been properly vented and 

tested. Any person entering a basin should be wearing a harness with safety rope 

extending to the surface so that they can be pulled out in case of asphyxiation. 

Sewage water gives off methane and hydrogen sulfide gases, both of which 

can be highly poisonous.

•  Installation and checking of electrical circuits and hardware should be 

performed by a qualified electrician.

•  Pump is never to be lifted by power cord.

 Unit must be flushed and disinfected, inside and out, prior 

to servicing.

GENERAL SYSTEM INSPECTION

Before the system is placed into operation, a system Start-up Report should be 

conducted by a qualified technician.

 Wiring and grounding must be in accordance with the national 

electrical code and all applicable local codes and ordinances.

LUBRICATION PROCEDURES

No lubrication is required.

•  If pumps are to be stored for more than six months, refer to short term storage    

procedure in the Operation section.

PREVENTIVE MAINTENANCE

Preventive maintenance is recommended to ensure a long service life from the 

product. Provided is a suggested maintenance schedule.

Every month:

•  Check for proper and unobstructed float operation.

•  Listen for proper check valve operation.

•  Duplex Units - Check for even operating times. Uneven times indicate a  

  defective unit, float switch or control.

•  Inspect the panel for any presence of moisture in enclosure, loose connections, and 

general component condition. check out location and  condition of float switches.

Every year:

•  In addition to the monthly checks, the basin should be inspected and cleaned. 

Any defective components should be replaced. Inspect and remove any sand, 

debris, or mud present in the pump basin assembly.

Every two years:

•  Inspect power cables for damage or wear. Replace immediately if damage  

  or wear is detected. Replace as required by an approved Service Station.

•  Inspect impeller for damage or wear. 

 

DOUBLE SEAL PUMPS

•  Double seal pumps offer extra protection. During every inspection of the unit, 

check the control panel seal failure for a warning. Whenever the seal leak 

is activated, indicating that the lower seal has failed, the pump should be 

removed and serviced in order to avoid damage to the motor.

Содержание X71 Series

Страница 1: ...1 Limited Warranty 2 Preinstallation Information 3 Electrical Data 3 Typical Sewage Installation 4 Pump Wiring Instructions 5 6 Operation 7 Maintenance 7 Service Checklist 8 Safety Instructions TO AVOID SERIOUS OR FATAL PERSONAL INJURY OR MAJOR PROPERTY DAMAGE READ AND FOLLOW ALL SAFETY INSTRUCTIONS IN THIS MANUAL AND ON THE PUMP THIS MANUAL IS INTENDED TO ASSIST IN THE INSTALLATION AND OPERATION ...

Страница 2: ...ment parts For additional information pertaining to our warranty or if service cannot be obtained locally contact Zoeller Engineered Products 3649 Cane Run Road Louisville Kentucky 40211 1961 Attn Customer Service ZOELLER ENGINEERED PRODUCTS EXPRESSLY DISCLAIMS LIABILITY FOR SPECIAL CONSEQUENTIAL OR INCIDENTAL DAMAGES OR BREACH OR EXPRESSED OR IMPLIED WARRANTY AND ANY IMPLIED WARRANTY OF FITNESS F...

Страница 3: ...in in detail the requirements for the installation and wiring of electrical equipment in hazardous locations 1 Not for use in acidic atmospheres 2 Do not lift carry or hang pump by the electrical cables Damage to the electrical cables can cause shock burns or death 3 Make sure there is a properly grounded connection available All pumps are furnished with provisions for proper grounding to help pro...

Страница 4: ...ble electrical and plumbing codes including but not limitedto NationalElectricalCode local regional and or state plumbing codes etc ZEPA0560 1 Electrical wiring and protection must be in accordance with the National Electrical Code per NEC articles 500 through 503 for installation in Class I Division 1 Group C D Class I Zone 1 Groups IIA IIB locations and any other applicable state and local elect...

Страница 5: ...rcuit in the seal cavity where 2 seal leak probes are housed An indicator light will activate whenever water is present in the cavity Whenever the seal leak light is activated indicating that the lower seal has failed the pump should be removed and serviced in order to avoid damage to the motor 3 The green wire shall be connected to a ground lug in the panel CONTROL PANELS These pumps require a co...

Страница 6: ...a control panel with level control is required Follow the instructions provided with the panel to wire the system Before installing a pump check the pump rotation to insure that wiring has been connected properly to power source and that the green lead of power cord See wiring diagram is connected to a valid ground Momentarily energize the pump observing the directions of kick back due to starting...

Страница 7: ...sired location of each float function Valves Dischargevalvesshouldbeplacedinthefullyopenposition Systems shouldnotbeoperatedforextendedperiodsoftimewiththedischarge valves partially closed due to damaging the valve SHUTDOWN PROCEDURES If a system is shutdown for more than six months the following is recommended Pumps If pit is to remain dry then the pump can remain in the pit With the pumpinthepit...

Страница 8: ...in head and or capacity after a period or use Increase Pipe Friction Clogged line or check valve Abrasive material chemical deteriorated impeller and pump housing If the above check list does not uncover the problem consult the factory Do not attempt to service or otherwise disassemble pump Service Checklist Trouble Shooting Steps Check Voltage At If No Voltage If Voltage No 1 Line terminals in pu...

Отзывы: