
4
SK3093
For Installation,
Maintenance,
Troubleshooting
and Service
Checklist,
please
refer to
the corresponding Pump Installation Manual and Replacement Parts List.
SK3092
1 1/2” (DN40) SCH 40 PVC PIPE
X 10"LG. (254 MM)(ALL
MODELS)
1 1/2” (DN40) SCH 40 PVC
TEE
NOTE: CHECK V
AL
VE SCREWS
INT
O PRIMAR
Y PUMP
DISCHARGE.
HAND-TIGHTEN ONL
Y.
WEEP
HOLE MUST
BE
VISIBLE.
FLOA
T SWITCH
DC PUMP
M73 PRIMAR
Y PUMP
CLAMP
TYPICAL
INST
ALLA
TION
EXPLODED VIEW OF PUMP
SYSTEM
FIGURE 1
R
R
DC PUMP
PLUMBED IN LINE WITH SUBMERSIBLE PUMP
BA
TTER
Y BOX
IMPOR
TANT
: OFF LEVEL
OF
FLOA
T
ASSEMBL
Y MUST
BE
1" (25 MM) MIN.
ABOVE
CENTER
OF TEE.
(SEE INST
ALLA
TION NOTE 3).
VERIFY
WEEP
HOLE IS
VISIBLE. (SEE PUMP
INST
ALLA
TION INSTRUCTIONS)
CHECK V
AL
VE
WEEP
HOLE PROVIDED
PUMP
DISCHARGE
1" (25 MM) MIN.
DET
AIL
"A"
(SCALE: 4X)
SEE DET
AIL
"A"
FIGURE 2
© Copyright 2016 Zoeller
®
Co. All rights reserved.