Zoeller ProPak 507 Скачать руководство пользователя страница 3

3

The DC emergency pump is designed as a backup to your primary sump pump during unexpected power outages or primary pump failure. The DC pump, 

electronic controls and all the parts required for installation are included except the battery which is supplied by the user. The system is designed for 

installation in sumps with minimum of 18" (457 mm) diameter and 24" (610 mm) deep. For 18" x 22" (457 mm x 559 mm) applications, consult factory.

DESCRIPTION

The DC emergency pump system requires a good quality, 12 volt battery to obtain maximum pumping time during a power outage.  A deep-cycle, 12 

volt, 105 amp-hour marine battery or larger is recommended and will provide approximately 7½ hours of continuous pumping time in a sump pump 

installation with 8' (2.4 mm) of head pressure.  In most installations the pump runs intermittently and the battery life is extended accordingly.  Batteries 

with top terminals are recommended for ease of installation.  These batteries contain acid and proper precaution must be taken when handling to fit in 

included battery box.  Maximum battery size to fit inside battery box is 12½" (318 mm) Length x 7" (178 mm) Width x 9½" (241 mm) Height.

BATTERY SELECTION

  1.   Electrical wiring and protection must be in accordance with National   

  Electrical Code and any other applicable state and local electrical   

 requirements.

  2.   All installations require a basin cover to prevent debris from falling into 

the basin and to prevent accidental injury.

  3.   Securely tape or clamp power cord to discharge pipe, clear of the float 

mechanism(s).

  4.  Use a full-size discharge pipe.

  5.   Basin must be in accordance with applicable codes and specifications.

  6.   Pump must be level and float mechanism(s) clear of sides of basin 

before starting pump.  Float switch may be repositioned as needed.

  7.  Basin must be clean and free of debris after installation.

  8.   Gate valve or ball valve to be supplied by installer and installed 

according to any and all codes.

  9.  Gas tight seals required to contain gases and odors.

  10.   Vent gases and odors to the atmosphere through vent pipe.

  11.    Install Zoeller Pump Stand (model 10-2421) under pump to  

  provide a settling basin.

RECOMMENDED INSTALLATION FOR ALL APPLICATIONS

EASY DO'S & DON'TS FOR INSTALLING A SUMP PUMP

   1.  DO read thoroughly all installation material provided with the system.

   2.  DO inspect system for any visible damage caused by shipping.  Contact 

dealer if system appears to be damaged.

   3.  DO clean all debris from the sump.  Be sure that the pump will have a hard, 

flat surface beneath it.  DO NOT install on sand, gravel or dirt.

   4.  DO be sure that the sump is large enough to allow proper clearance for the 

level control switch(es) to operate properly.

   5.  DO always disconnect pump from power source before handling.

    DO always connect to a separately protected and properly grounded circuit.

    DO NOT ever cut, splice, or damage power cord (Only splice in a watertight 

junction box).

    DO NOT carry or lift pump by its power cord.

    DO NOT use an extension cord with a sump pump.

   6.  DO install a union in the discharge line.

    DO NOT use a discharge pipe smaller than the pump discharge.

  7.  DO NOT use a sump pump as a trench or excavation pump, or for pumping 

sewage, gasoline, or other hazardous liquids.

  8.  DO test system immediately after installation to be sure that the system is 

working properly.

  9.  DO cover sump with an adequate sump cover.

  10.  DO review all applicable local and national codes and verify that the installation 

conforms to each of them.

  11.  DO consult manufacturer for clarifications or questions.

  12.  DO inspect and test system for proper operations at least every three months.

The DC controller is equipped with a 10 amp charger for 

maintaining the battery in a ready state and recharging 

the battery after use when AC power is restored.  Time for 

recharge depends upon the amount of power consumed 

by the pumping cycle during the AC power interruption.  

The system may return to the charged LED position in a 

very short period of time.  A completely drained battery 

may require up to 24 hours for full recharge.  

PERFORMANCE

Total Dynamic Head

5 ft (1.5 m)

10 ft (3.0 m)

14.5 ft (4.4 m)

Flow GPM (LPM)

22 (83)

11 (41)

Shut-off Head

The DC pump performance with fully charged 12 V battery

Shut-off Head:

Feet

MODEL

5

15

10

1.5

4.6

3.0

Meters

18 ft. (5.5 m)

Liters

38
30
14

Gal.

73

144

53

114

TOTAL DYNAMIC HEAD/FLOW

PER MINUTE

DEWATERING ONLY

METERS 

TOT

AL

 DYNAMIC HEAD

0

2

4

6

40

30

10

20

FLOW PER MINUTE

LITERS 

GALLONS

0

80

10

5

15

20

PUMP PERFORMANCE CURVE

FEET

MODEL 73

© Copyright 2016 Zoeller

®

 Co. All rights reserved.

Содержание ProPak 507

Страница 1: ...dinances 6 FOR YOUR PROTECTION ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE HANDLING Single phase pumps are supplied with a 3 prong grounded plug to help protect you against the possibility of electrical shock DO NOT UNDER ANY CIRCUMSTANCES REMOVE THE GROUND PIN The 3 prong plug must be inserted into a mating 3 prong grounded receptacle If the installation does not have such a receptacle it...

Страница 2: ...batteries We offer both a Water Acid Deep Cycle Battery and maintenance free AGM battery which can run the pump continuously for over 7 hours These times are based on continuous pumping at 8 2 4 mm of static head Actual times will vary depending on static head volume of water entering the pit and the condition of the battery Follow these recommendations Use a B C I size 27 deep cycle battery 175 m...

Страница 3: ...TALLATION FOR ALL APPLICATIONS EASY DO S DON TS FOR INSTALLING A SUMP PUMP 1 DO read thoroughly all installation material provided with the system 2 DO inspect system for any visible damage caused by shipping Contact dealer if system appears to be damaged 3 DO clean all debris from the sump Be sure that the pump will have a hard flat surface beneath it DO NOT install on sand gravel or dirt 4 DO be...

Страница 4: ...HTEN ONLY WEEP HOLE MUST BE VISIBLE FLOAT SWITCH DC PUMP M73 PRIMARY PUMP CLAMP TYPICAL INSTALLATION EXPLODED VIEW OF PUMP SYSTEM FIGURE 1 R R DC PUMP PLUMBED IN LINE WITH SUBMERSIBLE PUMP BATTERY BOX IMPORTANT OFF LEVEL OF FLOAT ASSEMBLY MUST BE 1 25 MM MIN ABOVE CENTER OF TEE SEE INSTALLATION NOTE 3 VERIFY WEEP HOLE IS VISIBLE SEE PUMP INSTALLATION INSTRUCTIONS CHECK VALVE WEEP HOLE PROVIDED PUM...

Страница 5: ...may be set on a nearby shelf or ledge The control charger should be located 3 0 9 m or 4 1 2 m above the sump 5 Connect the green sensor wire to the sensor connector figure 3 6 Connect the leads from the control charger to the battery terminals White positive lead to positive terminal and black negative lead INITIAL START UP AND OPERATION 1 Test the installation for leaks by running water into the...

Страница 6: ...ECKLIST EXPLODED VIEW DC PUMP All installations must comply with all applicable electrical and plumbing codes including but not limited to National Electrical Code local regional and or state plumbing codes etc Not intended for use in hazardous locations SK2501 BATTERY BOX 12 VOLT MARINE BATTERY SUPPLIED BY USER FIG 5 DC BACK UP PUMP CLAMP FLOAT SWITCH WHITE LEAD TO POSITIVE BLACK LEAD TO DC PUMP ...

Страница 7: ...condition a mixture of air and water may cause a complete or partial air lock and reduce or stop the flow of water in the discharge pipe b Baffle the incoming stream of water to reduce turbulence Diverting water stream against wall of basin usually corrects an air lock problem 7 Water level stays high DC Pump continues to run a Battery is low b If power has been restored and water in sump remains ...

Страница 8: ...CYCLED CHARGING ALARM RESET LOW BATTERY ALARM OFF ALARM CONTACTS GREEN LEAD TO FLOAT SWITCH BLACK LEAD WHITE LEAD FIGURE 4 SK2503 FIGURE 5 SK2958 LCD DISPLAY AND KEYPAD FUNCTIONS There are two buttons on the front of the charger The scroll button is used to cycle through the information on the LCD screen The alarm reset button Can be pressed to clear alarm buzzer light and or display Can be held f...

Страница 9: ... la bombanecesiteconectarseaunacajadeconexiónestancaalagua sepuede quitar el enchufe y empalmarla al cable de alimentación debidamente puesto a tierra Para mayor seguridad es posible que este circuito esté protegido con un interruptor con detección de falla a tierra La instalación completa debe cumplir el Código Eléctrico Nacional y todos los códigos y disposiciones locales pertinentes 6 PARA SU P...

Страница 10: ...cerá garantía alguna por ningún material o producto que haya sido desarmado sin aprobación previa del Fabricante o que haya sido sometido a uso indebido aplicación indebida negligencia alteración accidente o acto de naturaleza que no haya sido instalado usado o mantenido según las instrucciones de instalación del Fabricante que haya sido expuesto a sustancias foráneas que incluyen pero no se limit...

Страница 11: ... el contenedor para agua debe quedar limpio y sin residuos 8 La válvula de paso o la válvula de bola deben ser suministradas por el instalador e instaladas de acuerdo con todos los códigos 9 Se requieren sellos estancos al gas que retengan los gases y olores 10 Ventile los gases y olores hacia la atmósfera a través de una tubería de ventilación 11 Instale el soporte de la bomba Zoeller modelo 10 2...

Страница 12: ...EBE ESTAR VISIBLE INTERRUPTOR DE FLOTADOR BOMBA CC M73 BOMBA PRINCIPAL ABRAZADERA INSTALACIÓN NORMAL VISTA EN DESPIECE DEL SISTEMA DE LA BOMBA FIGURA 1 R R BOMBA DE CC CONECTADA EN LÍNEA CON BOMBA SUMERGIBLE CAJA DE BATERÍA IMPORTANTE EL NIVEL DE APAGADO DEL CONJUNTO DE FLOTADOR DEBE ESTAR A UN MIN DE 2 5 CM 1 PULG POR ENCIMA DEL CENTRO DE LA T VEA LA NOTA DE INSTALACIÓN 3 VERIFIQUE QUE EL ORIFICI...

Страница 13: ... conveniente el cargador de control puede ajustarse en un estante o repisa que esté cerca El cargador de control debe estar situado a 0 9 o 1 2 m 3 o 4 pies por encima del sumidero 5 Conecte el cable verde del sensor al conector del sensor figura 3 6 Conecte los cables del cargador de control a los terminales de la batería El cable blanco pos al terminal positivo y el cable negro ARRANQUE INICIAL ...

Страница 14: ... con todos los códigos eléctricos y de instalación sanitaria aplicables incluyendo pero sin limitarse al Código Eléctrico Nacional los códigos locales regionales y o los códigos estatales de instalación sanitaria etc No se debe usar las instalaciones en lugares peligrosos No está diseñada para uso en lugares peligrosos SK2501 CAJA DE BATERIA BATERÍA MARINA DE 12 V PROVISTA POR EL USUARIO FIG 5 BOM...

Страница 15: ...orriente de 115 V y desconecte el cable negro negativo del cargador de la batería Compruebe la batería Reemplace el motor si es necesario Vuelva a conectar y consulte el paso Instalación paso 7 9 La alarma no suena cuando la bomba está en funcionamiento a La bomba tiene que estar en funcionamiento durante 1 o más segundos antes de que suene la alarma b Asegúrese de que alarma no haya sido silencia...

Страница 16: ...BAJA ALARMA DESACTIVADA CONTACTOS DE LAALARMA CABLE VERDE AL INTERRUPTOR DE FLOTADOR CABLE NEGRO CABLE BLANCO FIGURA 4 SK2503 FIGURA 5 SK2958 PANTALLA LCD Y FUNCIONES DEL TECLADO Hay dos botones en la parte frontal del cargador El botón de desplazamiento se utiliza para desplazarse por la información en la pantalla LCD El botón de reinicio de la alarma Puede ser presionado para silenciar el timbre...

Страница 17: ...A BROCHE DE MISE À TERRE La fiche à 3 broches doit être insérée dans une prise à 3 broches mise à la terre Si l installation ne comprend pas de prise il faut la changer pour le type approprié la câbler et la mettre à la terre en conformité avec le code national de l électricité ainsi que tous les codes et règlements locaux applicables 7 Risqued électrocution Nepasenleverlecordond alimentationniled...

Страница 18: ...Il faut utiliser une batterie à décharge poussée B C I de taille 27 avec une réserve de 175 minutes ou de plus grande capacité IL NE FAUT PAS utiliser de batterie sans entretien sauf si elle est du type à électrolyte gélifié ou de type AGM Il faut remplacer la batterie tous les trois ans Il ne faut pas permettre l accumulation de corrosion sur les bornes de la batterie Il ne faut pas mettre la bat...

Страница 19: ...nstaller and installed according to any and all codes 9 Gas tight seals required to contain gases and odors 10 Des joints étanches aux gaz sont nécessaires pour contenir les gaz et les odeurs 11 Installer le pied de pompe Zoeller modèle 10 2421 sous la pompe pour fournir une cuve de décantation INSTALLATION RECOMMANDÉE POUR TOUTES APPLICATIONS CONSEILS POUR L INSTALLATION D UNE POMPE DE PUISARD 1 ...

Страница 20: ... ÉVENT DOIT ÊTRE VISIBLE INTERRUPTEUR À FLOTTEUR POMPE C C POMPE PRINCIPALE M73 COLLIER INSTALLATION TYPIQUE VUE EXPLOSÉE DE LA POMPE FIGURE 1 R R IMPORTANT LE NIVEAU D ARRÊT DU FLOTTEUR DOIT ÊTRE À 2 5 CM 1 PO AU MINIMUM AU DESSUS DU CENTRE DU TÉ VOIR LE POINT 3 DE L INSTALLATION S ASSURER QUE LE TROU D ÉVENT EST VISIBLE VOIR LES INDICATIONS D INSTALLATION DE LA POMPE CLAPET ANTIRETOUR TROU D ÉVA...

Страница 21: ... 3 et 4 pi au dessus du puisard 5 Raccorder le fil vert du capteur au raccordement du capteur figure 3 6 Brancher les fils du chargeur aux bornes de la batterie Le fil positif blanc à la borne positive et le fil négatif noir à la borne négative de la batterie Lorsque la connexion est bonne une alarme de test retentit DÉMARRAGE INITIAL ET FONCTIONNEMENT 1 Tester l installation à la recherche de fui...

Страница 22: ...allations doivent être conformes aux codes électriques et de plomberie applicables y compris mais pas limité aux codes électriques nationaux locaux régionaux et aux codes de plomberie provinciaux Pas conçu pour utilisation dans les endroits dangereux SK2501 FIGURE 3 Copyright 2016 Zoeller Co Tous droits réservés BOÎTIER DE LA BATTERIE 12 V BATTERIE MARINE FOURNIE PAR L UTILISATEUR POMPE DE SECOURS...

Страница 23: ...e la prise murale 115 V puis débrancher le fil noir du chargeur sur la borne négative de la batterie Vérifier la batterie La remplacer si nécessaire Rebrancher et se référer à l installation étape 7 9 L alarme ne sonne pas lorsque la pompe fonctionne a La pompe doit fonctionner pendant au moins une seconde avant que l alarme ne sonne b S assurer que l alarme n est pas en mode silencieux Appuyer et...

Страница 24: ...orsque le flotteur l est aussi L alarme est retardée afin de réduire les nuisances sonores Le voyant jaune alarme désactivée indique que l alarme est actuellement en mode silencieux DÉTECTEURS DE MONOXYDE DE CARBONE Que vous ayez une pompe de secours Basement Sentry ou d une marque concurrente toutes les batteries produisent des sous produits gazeux lorsqu elles sont en charge Certains de ces sous...

Отзывы: