8
© Copyright 2022. All rights reserved.
Figure 8
1. This product must be connected to a grounded, metallic,
permanent wiring system, or an equipment-grounding
terminal or lead on the product.
2. Place the blower where it is easily accessible for maintenance
and inspection.
3. Install the blower in an area where it will be protected from
damage and flooding. Also make certain the location has
good ventilation. DO NOT place the blower below water
level as back-siphoning can occur.
4. Install the blower on a foundation that is level and solid.
5. Excavate trench for air line from blower to the switching
valve, and trench for air lines from switching valve to
Fusion
®
unit.
6. Install one 1" (25.4 mm) air line from the blower to the timer
in front of switching valve switching valve. Piping should
be less than 17' (5 m) from blower to Fusion
®
unit. The
recirculation line is 3/4" (19 mm) and the backwash line is
1" (25.4 mm).
7. The blower is provided with one discharge port. Install the
included air line PVC tees in the backwash and recirculation
lines.
8. Attach the small diameter black air tubing (included in the
blower
box) to barbed fitting on PVC tee. Black air tubing
and blower cord should be routed to the control panel
through conduit. Attach the black air tubing line to the air
pressure sensor barbed fittings in the panel. (Figure 10) If
air tubing is not connected to backwash and recirculation
lines, the panel will alarm.
9. Connect the remaining end of the PVC tee to the airline
installed in Step 6.
10. The switching valve is 100V and must be connected to the
panel through the use of the supplied transformer. See
included transformer timer installation instructions.
BLOWER INSTALLATION AND PLACEMENT
Figure 9
SK2930
SK2955
WARNING!
CLEANOUT
SEWER
ALARM FLOAT CONDUIT
INSTALLED BY CONTRACTOR
WHERE APPLICABLE
CLARUS FUSION
ALARM PANEL
BLOWER
TIMER SWITCHING VALVE
RISER AND LID
AIR LINES TO
TREATMENT UNIT
TO DISPERSAL
W.L
W.L
W.L
OPTIONAL SEPTIC TANK INSTALLATION
MAY BE REQUIRED BY
LOCAL OR STATE REGULATIONS
BACKWASH HOSE
SUPPLIED
(RED CONNECTION)
TIMER SWITCHING VALVE
AERATION HOSE
SUPPLIED
(BLUE CONNECTION)
MOUNTING BRACKET
CLAMP
BLOWER HOSE
SUPPLIED
ZFL TREATMENT UNIT
POWER CORD
AIR LINE SENSOR FITTING
RED CONNECTION
BACKWASH
BLUE CONNECTION
AERATION
Содержание Fusion Series
Страница 17: ...17 Copyright 2022 All rights reserved ...