Introduction

The preassembled 24 x 24 sewage system is complete and job ready from the 

factory for easy installation. Its compact design makes it perfect for low burial 

depth applications. The system features a removable access port that allows 

for the immediate observation of pumps and floats. Additional features include 

a 41-gallon capacity, a built in anti-flotation device, and a construction cover to 

keep everything clean during installation.

 

INSTALLATION

 

Preparation

Inspect your basin assembly. If the unit has been damaged in shipment or if 

parts are missing, contact your distributor before installing. Carefully read all 

literature to familiarize yourself with details regarding installation and use. Retain 

materials for future reference. All installations must comply with all applicable 

electrical and plumbing codes, including but not limited to the National Electrical 

Code, local, regional and/or state plumbing codes, etc. 

The clear construction cover can be reattached after reading the appropriate 

materials. It will ensure the cover, cordage, etc. remains clean during installation.

Excavation

 

Excavate a hole for the basin in a very low traffic area in proximity to a proper 

electrical outlet. The hole should be at least 8” larger in diameter than the basin 

in order to leave 4” of backfill all the way around the perimeter. A minimum of 4” 

of compacted subbase is also required. Backfill and subbase should be 1/8” to 

3/4” pea gravel or 1/8” to 1/2” crushed stone.

Basin Placement 

Ensure compacted subbase is free of any sharp rocks that could come into 

direct contact with the basin. Place basin into pit and verify that it is level. It 

is recommended that the top of the basin is level with the surrounding finished 

floor. Once the desired positioning has been achieved, partially backfill basin to 

help hold in place. Ensure enough room is left below the inlet to make the inlet 

connection. Connect the 4” inlet pipe using a no-hub style connector and finish 

backfilling around the basin with the specified media. Care should be taken not to 

damage components or leave voids when backfilling. Finish grade of floor should 

be poured in place around the top 6” of the basin assembly.

Electrical Connections

 

FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP 

FROM ITS POWER SOURCE BEFORE HANDLING. 

 Single phase pumps are 

supplied with a 3-prong grounded plug to help protect you against the 

possibility of electrical shock. 

DO NOT, UNDER ANY CIRCUMSTANCES, 

REMOVE THE GROUND PIN.

  The 3-prong plug must  be inserted into a 

mating 3-prong grounded receptacle. If the installation does not have 

such a receptacle, it must be changed to the proper type, wired and 

grounded in accordance with the National Electrical Code and all 

applicable local codes and ordinances.

 

Risk of electrical shock

.

  Do not remove power supply 

cord and strain relief or connect conduit directly to the pump.

 Installation and checking of electrical circuits and 

hardware should be performed by a qualified licensed electrician.

Discharge/Vent

The 2” threaded discharge and vent ports are located and labeled on top of the 

cover. Installations containing sewage pumps: 211, 212, 264, or 266 models must 

not use a discharge smaller than 2”. Installations containing grinder pumps: 803, 

805, or 807 must not use a discharge smaller than 1.25”. All venting needs to be 

installed in accordance with any/all local and national plumbing codes.

Simplex:

Using an adapter, connect discharge pipe to the “Discharge” 2” threaded port and 

connect vent pipe to the “Discharge/Vent” 2” threaded port. 

Duplex:

Using an adapter, connect discharge pipes to both 2” threaded ports on top of 

the cover. For the vent, use a 3” hole saw to drill a hole located at the pilot hole 

indention on the cover. Install the included pipe seal and use 2” pipe for the vent. 

Inspection Port

912/915 24x24 systems are equipped with an inspection port in the lid to allow for 

the  convenient  observation  and  replacement  of  pump/alarm  floats  as  needed. 

For access, remove the safety screw located on top, turn the inspection cap 

counterclockwise and lift. 

Float heights are preset from the factory for optimum performance. During startup, 

ensure all floats have adequate clearance and are operating appropriately.

Float tree removal:

The float tree may be easily removed for the inspection and replacement of floats. 

It is held in place with compression between the lid and basin. To remove the float 

tree, simply push down on the handle on top to free it from the bottom of the lid. 

Lift the tree and floats upward through the inspection port. Lift the appropriate 

cord seals from the top of the cover to relieve any attached cords. To reattach, 

ensure cord seals have been fully inserted and lower the float tree back through 

the inspection port. Reinsert the bottom of the float tree into the premolded ring 

and push down on the top handle to reattach on the premolded bottom section of 

the lid. Ensure floats are oriented with adequate clearance for operation. 

© Copyright 2020 Zoeller Co. All rights reserved.

Содержание 915

Страница 1: ...pressurized and hot when operating Allow 2 1 2 hours after disconnecting before attempting service 9 Pump is not intended for potable water due to possible contamination by oil contained in the pump...

Страница 2: ...derivatives oil gasoline solvents etc or other abrasive or corrosive substances wash towels or feminine sanitary products etc in all pumping applications The warranty set out in the paragraph above i...

Страница 3: ...loat mechanism s 6 Use a discharge pipe equivalent in diameter to the pump s discharge 7 Basin must be in accordance with governing codes and specifications 8 Pump must be level and float mechanism s...

Страница 4: ...MATERIAL REQUIREMENTS MINIMUM 4 COMPACTED SUB BASE NO HUB STYLE CONNECTOR 4 INLET PIPE INSTALLED BY CONTRACTOR MINIMUM 4 BACKFILL MATERIAL SEE REQUIREMENTS BELOW ROTOMOLDED BASIN AS PER ENGINEER S SPE...

Страница 5: ...electrical shock DO NOT UNDER ANY CIRCUMSTANCES REMOVE THE GROUND PIN The 3 prong plug must be inserted into a mating 3 prong grounded receptacle If the installation does not have such a receptacle i...

Страница 6: ...___________________________________________________________ __________________________________________________________________ __________________________________________________________________ ______...

Страница 7: ...___________________________________________________________ __________________________________________________________________ __________________________________________________________________ ______...

Страница 8: ...020 Zoeller Co All rights reserved MAIL TO P O BOX 16347 Louisville KY 40256 0347 SHIP TO 3649 Cane Run Road Louisville KY 40211 1961 502 778 2731 1 800 928 PUMP FAX 502 774 3624 Visit our website zoe...

Отзывы: