On some installations, it may be desirable
to install an independent hanger for the
level control switches to avoid possible
hang-ups on the pumps, piping, valves,
etc. Float hangers are available from
Zoeller Company on Catalog Sheet
FM0526 or can be fabricated from
standard pipe and fittings.
Suggested Methods of Float Installation
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
TYPICAL FLOAT HANGER ON STEEL COVER PITS
ACCESS COVER
STANDARD PIPE
FLANGE
PVC OR LIGHT WEIGHT
STAINLESS STEEL PIPE
PEA GRAVEL
TYPICAL FLOAT HANGER ON CONCRETE PITS
OR SEPTIC TANK RISERS
10-1457 FLOAT TREE
WITH 3 FLOATS SHOWN
SK1217
SK1218
RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
All installations must comply with all applicable electrical and plumbing codes, including, but not limited to, National Electrical Code, local, regional, and/or state plumbing
codes, etc. Not intended for use in hazardous locations.
TYPICAL SEWAGE INSTALLATION
SK290
4” (100 mm)
OF GRAVEL
Always refer to
FM0551 and/or
SSPMA recom-
mended sewage
pump installation
and maintenance.
TYPICAL EFFLUENT INSTALLATION
SK291
WW1
EFFLUENT
FILTER
See FM0531, FM0732, FM1597 & FM1420
for alarms, controls & junction boxes
TYPICAL DEWATERING INSTALLATION
SK292
TURN
ON
TURN
OFF
1
2
3
7
9
14
8
6
4
5
10
12
13
4” (10 cm) OF GRAVEL
MINIMUM
(457 mm X 610 mm)
18"x24" BASIN
LARGER DEPTHS
MAY BE
REQUIRED.
See FM0531, FM0732, FM1597 & FM1420 for
alarms, controls & junction boxes
1. Electrical wiring and protection must be in accordance with governing
electrical codes.
2. Install proper Zoeller Unicheck (combination union and check valve),
preferably just above the basin to allow easy removal of the pump
for cleaning or repair. If high head or below-cover installation is
required, use 30-0164 on 1-1/2" (DN40) pipe, 30-0152 on 2" (DN50)
pipe and 30-0160 on 3" (DN80) pipe.
3.
All installations require a basin cover to prevent debris from falling into
the basin and to prevent injury.
4. When a Unicheck is installed, drill a 3/16" (5 mm) diameter hole in the
discharge pipe even with the top of the pump. NOTE: THE HOLE
MUST ALSO BE BELOW THE BASIN COVER AND CLEANED
PERIODICALLY.
(High Head unit see “Caution” on front page). Water
stream will be visible from this hole when pump is operating.
5. Securely tape or clamp power cord to discharge pipe, clear of the float
mechanism(s).
6. Use a discharge pipe equivalent in diameter to the pump's discharge.
7. Basin must be in accordance with governing codes and specifications.
8. Pump must be level and float mechanism(s) clear of sides of basin
before starting pump.
9. Basin must be clean and free of debris after installation.
10. Gate valve, shut-off valve, or ball valve to be supplied by installer and
installed according to any and all codes.
11. Locate float switches as shown in sketches. The best place for the “off”
point is above the motor housing and positioned 180° from the inlet.
Never put “off” point below discharge on pump
12. Gas-tight seals are required to contain gases and odors.
13. Vent gases and odors to the atmosphere through vent pipe.
14. Optional pump stand (P/N 10-2421) eliminates the need for blocks or
bricks under the pump. For use with effluent and dewatering pumps only.
15. Optional watertight control box available, see FM1597 for details.
16. For proper spacing of
"On" - "Off" switches refer to local or
national standards and guidelines.
17. Optional septic tank risers for easy access to pump, controls and filters.