© Copyright 2012 Zoeller Co. All rights reserved.
STEP 2
Final Assembly
NOTE: External plumbing con
-
figuration will vary depending
on the location of basin, location
of main stack and available
space.
Place the basin assembly in its final
position and complete plumbing.
Secure all connections shown in
Figure 2.
Illustrated Parts Breakdown
*When ordering this item, order the hardware pack item #6.
MODEL 132
Rev. A
Rev. B
ITEM DESCRIPTION
QTY
08/02
thru
12/10
01/11
thru
Current
1
Drain Pump
1
132-0001 132-0001
2
M72 (See FM1722)
1
72-0001
72-0001
3
Basin - Tank
1
013017
013017
4
Discharge Tube
1
013732
150861
5
Basin - Lid
1
013018
013018
6
Hardware Pack
1
013731
013731
7
Basin Seal
1
N/A*
N/A*
8
Unicheck
1
30-0181
019768
9
¼ - 20X1" lg. RHM Screw S.S.
8
N/A*
N/A*
10
¼ - Flat Washer S.S.
16
N/A*
N/A*
11
¼ - 20 Hex. Hd. Nut - S.S.
8
N/A*
N/A*
12
Pipe Cap w/o-ring
1
N/A*
N/A*
13
O-Ring
1
N/A*
N/A*
SK2832
REV. "A"
REV. "B"
1
9
10
11
2
6
3
5
7
8
4
12
13
Figure 2
Drain Pump 132
SK2833
STEP 3
Initial Testing of Drain Basin System
1. Plug the cord into a properly grounded GFCI receptacle.
2. Fill the basin with 2-3 gallons of water and let sit for 3-4
minutes to enable the environmentally safe peanuts to begin
dissolving.
3. Slowly fill the basin with water.
4. Check all plumbing for leaks as the basin fills.
5. Verify that the pump starts and stops.
6. Check the discharge line for leaks as the pump empties
the basin.
7. Repeat steps 2 through 6 as necessary to ensure proper
operation.
8. If problems persist, refer to the troubleshooting guide
located on page 2 of this manual.