
Page 21/68
E
N
G
L
I
S
H
BUOYANCY CHAMBER – Assembling the buoyancy
chamber on the hull
II-1-INSTALLING THE BUOYANCY CHAMBER ON THE HULL
The buoyancy chamber is delivered installed on the hull. Follow the instructions below when
replacing the buoyancy chamber.
NOTE:
The buoyancy chamber is fitted to the hull with the buoyancy
chamber deflated.
You can inflate the non-installed buoyancy chamber (pressure
240mb) and let it stabilize for around one hour. Then deflate it.
If the buoyancy chamber was stored at a temperature lower than
0°C, leave it for 12 hours at room temperature (20°C) before
folding it.
1
To facilitate the positioning of the buoyancy chamber, apply liquid soap (a) to the hull rails
2
Position the buoyancy chamber’s rope (a) on the hull’s rail (b) situated at the forward end
of the hull. Pull the buoyancy chamber until the mini-boltrope is brought opposite the
forward rail (c).
a
c
b
Содержание NZO 700
Страница 1: ...Page 1 68 E N G L I S H Owner s Manual Volume 2...
Страница 32: ...Page 32 68 INSTALLATION AND CIRCUIT Electricity IV 2 Electricity IV 2 1 Layout diagram...
Страница 33: ...Page 33 68 E N G L I S H INSTALLATION AND CIRCUIT Electricity IV 2 2 Drawings of the master wiring harness...
Страница 37: ...Page 37 68 E N G L I S H INSTALLATION AND CIRCUIT Electricity LS option Lights Lights LS option...
Страница 61: ...Page 61 68 E N G L I S H LABELLING V 1 POSITION OF SAFETY LABELS AND REGISTRATION PLATES 8 3 4 5 7 2 6 1 9...
Страница 62: ...Page 62 68 LABELLING V 2 DESCRIPTION OF SAFETY LABELS AND REGISTRATION PLATES 1 4 3 2...
Страница 66: ...Page 66 68 LOCATION OF OPTIONAL ACCESSORIES VI 3 PLOTTER VHF not supplied VHF Plotter...