2 / 14
PUTTING THE BOAT INTO USE
To identify the boat, turn to the APPENDICES:
•
Technical specifications (page A-2, A-3),
•
Description (page A-4, A-8).
warning
WHEN ASEMBLING THE BOAT, IT IS IMPORTANT THAT YOU
FOLLOW THE PROCEDURE IN THE CORRECT ORDER. REFER TO
THE PAGES INDICATED BELOW FOR STEP BY STEP INSTRUCTIONS.
Procedure for putting the boat into use and storage
Page Section
1. Inventory upon opening
2
INVENTORY UPON OPENING
2. Activate the valves to inflation position
3
INFLATION SYSTEM
3. Slightly inflate the buoyancy tube
6
BOAT INFLATION
4. Inflate the buoyancy tube
6
BOAT INFLATION
5. Inflate the H2P floor
6
BOAT INFLATION
6. Inflate the keel
6
BOAT INFLATION
7. Adjust the pressures
9
AIR PRESSURE
8. Store the boat
11
DEFLATION/FOLDING
warning
IN THE CASE OF QUICK INFLATION, REFER TO THE PARAGRAPH
ENTITLED “Quick inflation System”
INVENTORY UPON OPENING
warning
DO NOT USE SHARP IMPLEMENTS (CUTTER, KNIFE, ETC…)
The package of your boat contains 1 buoyancy tube as well as:
Description
ERB 380-400
1. H2P Floor
1
2. Repair kit
1
3. Owner manual (2 volumes)
1
4. Buoyancy tube quick inflation system, including compressed air cylinder
1
5. Cylinder sheath on floor
1
6. Quick keel inflation system
1
7. Equipment stowage bag
1
8. Respirator haversack
1
9. Telescopic paddles
2
10. Inflation pump (1 standard Heavy-duty inflation pump and 1 high-pressure
inflation pump)
2
NOTICE
If you wish to replace lifting rings (for davits) you must imperatively attach them to the
buoyancy tubes and transom (and not to the floor).