background image

 

9 / 12 

 E 
 N 
 G 

  

  

 S 
 H 

 

INFLATING A CADET AERO BOAT 

 

Activate all valves in the inflation position. 

 

Attach  the  hose  connector  to  the  inflator  inflation 
port. 
To inflate your boat properly, the inflator should be 
correctly placed on the ground.  
The  boat  inflates  rapidly  if  the  inflator  is  used 
smoothly and without haste. 

 

 

 

CAUTION

 

 

DO NOT USE A COMPRESSOR OR COMPRESSED AIR CYLINDER. 

 

A - INFLATE THE HIGH PRESSURE FLOORBOARD 

(AEROTECH MODELS ONLY)

 

 

1. 

Inflate Insert the pipe as shown in figure A (with the cap inserted) and begin to inflate leaving 

the cap inserted. The inflator uses its full capacity. Inflate until hard. 

 

2. 

Then remove the cap. The pump automatically uses the smallest chamber needed to provide 

the High Pressure bottom inflation pressure without undue force. Complete inflation in position B until 
the recommended pressure is reached 

(see "PRESSURE" section)

 

 

B - INFLATE THE MAIN BUOYANCY TUBE AND THEN THE KEEL 

 

 

CAUTION 

 

NEVER USE POSITION B

 TO INFLATE THE BUOYANCY TUBE 

OR THE KEEL: 

BURSTING HAZARD.

 

 

Inflate the buoyancy tube Insert the pipe as shown in figure A (with the cap inserted) and begin to 
inflate leaving the cap inserted. The inflator uses its full capacity and allows the recommended 
pressure 

(see "PRESSURE" section)

) to be achieved. Make sure that the pressures between 

the compartments are equalized, until the partitions (a) can no longer be seen. 

 

 

 

Never pressurise a 

compartment when the 

others are completely 

deflated 

 

 

 

 
 

 

  

 

 
 

 

Then inflate the keel 

(see "PRESSURE" section)

 

Inflating is complete: screw on the inflating valve caps. 

 

 

NOTE: 

A slight air leak is normal before the valve cap is screwed on 

ONLY THE VALVE CAPS CAN ENSURE FINAL AIR TIGHTNESS

 

 

Содержание CADET 200 Roll Up

Страница 1: ...1 12 E N G L I S H CADET 200 Roll Up 230 Roll Up 270 Roll Up 200 Aero 230 Aero 270 Aero 310 Aero 350 Aero 270 ALU 310 ALU 350 ALU Volume 2...

Страница 2: ...DEALS IN GENERAL WITH THE OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS TO BE OBSERVED ONBOARD THE BOAT AND ON THE WATER VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE B...

Страница 3: ...ssure pressure 8 9 INFLATING THE BOAT 10 PRESSURE 6 Install the oars 11 EQUIPMENT ASSEMBLY CHECK ON UNPACKING CAUTION DO NOT USE A SHARP TOOL CUTTER KNIFE ETC The pack must contain 1 buoyancy tube CAD...

Страница 4: ...RESSURE FLOORBOARD DISASSEMBLY MAINTENANCE When folding the boat we recommend you leave the floorboard in place in the boat However to clean the bottom of the boat where sand and other waste may accum...

Страница 5: ...ike position fig 1 and 2 6 Check that all sections are correctly aligned fig 4 7 Flatten the apex by standing on it in the boat and pulling the lifelines to prevent the fabric from being pinched fig 2...

Страница 6: ...12 6 BOAT ASSEMBLY fig 1 A fig 1 B a floorboard b buoyancy tube c bow angle d bottom a b c d fig 2 1 5 4 2 3 6 fig 3 fig 4 7 8 1 2 3 4 5 6 1 2 3 4 5 7 9...

Страница 7: ...e boat Position B The flow is inferior to position A but provides pressure that is superior with the same effort Position C To deflate Insert the tube as indicated in figure C and pump normally C THE...

Страница 8: ...rical air pump ACCESS ask your Dealer INFLATING THE BUOYANCY CHAMBER see PRESSURE section Inflate the buoyancy mechanism balancing the pressure between the different compartments until the partitions...

Страница 9: ...flation pressure without undue force Complete inflation in position B until the recommended pressure is reached see PRESSURE section B INFLATE THE MAIN BUOYANCY TUBE AND THEN THE KEEL CAUTION NEVER US...

Страница 10: ...at is exposed to direct sunlight on the beach temperature 50 C at the recommended pressure 240 mb 3 48 PSI When you launch it temperature 20 C the temperature and internal pressure of the inflatable c...

Страница 11: ...11 12 E N G L I S H EQUIPMENT ASSEMBLY OARS THWART Install the thwart before completing inflation Clic...

Страница 12: ...o fold the boat 5 Empty the boat of all water and sand by opening the self bailers dry it 6 Fold in the 2 sides of the main buoyancy tube A fold the cones onto the transom then roll up the boat around...

Отзывы: