background image

 / 12 

4

 

BOAT ASSEMBLY 

 

 

CHOOSE A SMOOTH, CLEAN SURFACE

IF  THE  BUOYANCY  TUBE  WAS  STORED  AT  A  TEMPERATURE  BELOW  0°C  / 

32°F, LEAVE IT AT 20°C / 68°F FOR 12 HOURS BEFORE UNFOLDING

 

CADET ROLL UP – BATTEN FLOORBOARD:  

 

If the battens are not installed, with the boat deflated, insert the battens in their brackets beginning with 
the batten nearest the aft transom. If a batten is difficult to insert, lubricate it with liquid soap. 

 

CADET AERO: -  INFLATABLE FLOORBOARD 

 

 

 high pressure floorboard DEFLATED 

 

 
 

 

HIGH PRESSURE FLOORBOARD DISASSEMBLY/MAINTENANCE 

 
When folding the boat, we recommend you leave the floorboard in place in the boat. 
However,  to  clean  the  bottom  of  the  boat  where  sand  and  other  waste  may  accumulate,  it  may  be 
useful to remove the inflatable floorboard. Follow this procedure: 
 
1.  DISASSEMBLY: Deflate the buoyancy tube and the floorboard. 

Slide  the  floorboard  bolt  rope  out  of  its  cleats  (following  the  assembly  procedure  in  the  reverse 
order). 

 
2.  MAINTENANCE: Slightly reinflate the boat and hose down the area between the buoyancy float and 

the bottom, and then lift the bow of the boat to let the water run out. Repeat the operation until all 
the sand or waste and has been removed. 

 
 

Содержание CADET 200 Roll Up

Страница 1: ...1 12 E N G L I S H CADET 200 Roll Up 230 Roll Up 270 Roll Up 200 Aero 230 Aero 270 Aero 310 Aero 350 Aero 270 ALU 310 ALU 350 ALU Volume 2...

Страница 2: ...DEALS IN GENERAL WITH THE OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS TO BE OBSERVED ONBOARD THE BOAT AND ON THE WATER VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE B...

Страница 3: ...ssure pressure 8 9 INFLATING THE BOAT 10 PRESSURE 6 Install the oars 11 EQUIPMENT ASSEMBLY CHECK ON UNPACKING CAUTION DO NOT USE A SHARP TOOL CUTTER KNIFE ETC The pack must contain 1 buoyancy tube CAD...

Страница 4: ...RESSURE FLOORBOARD DISASSEMBLY MAINTENANCE When folding the boat we recommend you leave the floorboard in place in the boat However to clean the bottom of the boat where sand and other waste may accum...

Страница 5: ...ike position fig 1 and 2 6 Check that all sections are correctly aligned fig 4 7 Flatten the apex by standing on it in the boat and pulling the lifelines to prevent the fabric from being pinched fig 2...

Страница 6: ...12 6 BOAT ASSEMBLY fig 1 A fig 1 B a floorboard b buoyancy tube c bow angle d bottom a b c d fig 2 1 5 4 2 3 6 fig 3 fig 4 7 8 1 2 3 4 5 6 1 2 3 4 5 7 9...

Страница 7: ...e boat Position B The flow is inferior to position A but provides pressure that is superior with the same effort Position C To deflate Insert the tube as indicated in figure C and pump normally C THE...

Страница 8: ...rical air pump ACCESS ask your Dealer INFLATING THE BUOYANCY CHAMBER see PRESSURE section Inflate the buoyancy mechanism balancing the pressure between the different compartments until the partitions...

Страница 9: ...flation pressure without undue force Complete inflation in position B until the recommended pressure is reached see PRESSURE section B INFLATE THE MAIN BUOYANCY TUBE AND THEN THE KEEL CAUTION NEVER US...

Страница 10: ...at is exposed to direct sunlight on the beach temperature 50 C at the recommended pressure 240 mb 3 48 PSI When you launch it temperature 20 C the temperature and internal pressure of the inflatable c...

Страница 11: ...11 12 E N G L I S H EQUIPMENT ASSEMBLY OARS THWART Install the thwart before completing inflation Clic...

Страница 12: ...o fold the boat 5 Empty the boat of all water and sand by opening the self bailers dry it 6 Fold in the 2 sides of the main buoyancy tube A fold the cones onto the transom then roll up the boat around...

Отзывы: