background image

 

3 / 12 

 E 
 N 
 G 

  

  

 S 
 H 

 

ASSEMBLY PROCEDURE 

 
The boat assembly procedure follows an order you must respect. Proceed step by step, referring each 
time to the pages indicated for explanations. 

 

PROCEDURE 

PAGE 

SECTION 

1. Make an inventory of the parts of your boat and get 
to know them. 

CHECK ON UNPACKING 

I - VI 

DESCRIPTION 

2. Activate the valves in the inflating position 

 Slightly inflate the main buoyancy tube 

INFLATION SYSTEM 

8 - 9 

INFLATING THE BOAT 

3. CADET Alu: Assemble the    floorboard 

and 

the 

stringers 

 5 - 6 

BOAT ASSEMBLY 

 CADET RU: Install the battens 

 CADET AEROTEC:  Inflate the floorboard. 

 

 

4. Install the thwart. 

11 

EQUIPMENT ASSEMBLY 

5. fully inflate the boat to the correct pressure  
pressure. 

8 - 9 

INFLATING THE BOAT 

10 

PRESSURE 

6. Install the oars 

11 

EQUIPMENT ASSEMBLY 

 

CHECK ON UNPACKING 

 

 

CAUTION

 

DO NOT USE A SHARP TOOL  

(CUTTER, KNIFE, ETC.) 

 

The pack must contain 1 buoyancy tube +: 

 

CADET

 

200-230-260  

Roll Up 

230-260  

Aero 

260 - 310 

Solid 

350 

SP Alu 

400 – 450 

SP Alu  

Battens 

X

 

 

 

 

 

Navy plywood floorboard  

 

 

X

 

 

 

Aluminium floorboard 

 

 

 

Aerotec inflatable floorboard 

 

 

 

 

Inflatable keel  

 

X

 

X

 

Stringers 

 

 

 

STANDARD EQUIPMENT

 

 

Oars  

2 paddles 

Inflator 

1

 

1

 

1

 

1

 

Removable thwart 

Bag 

Repair kit 

1

 

1

 

1

 

1

 

Owner's manual 

2

 

2

 

2

 

2

 

 

 

You  can  equip  your  boat  with  many  optional  accessories  (transportation  wheels,  ladder,  lifting  rings 
etc.).  Ask your dealer to advise you. 

NOTE: 

IF YOU WANT TO ADD LIFTING RINGS (FOR DAVIT HANDLING), YOU 
MUST  SECURE  THEM  TO  THE  BUOYANCY  TUBES,  NOT  ON  THE 
FLOORBOARDS  (EXCEPT  FOR  THE  CADET  400  SR,  SEE  "LOCATION 
OF ACCESSORIES"). 

Содержание CADET 200 Roll Up

Страница 1: ...1 12 E N G L I S H CADET 200 Roll Up 230 Roll Up 270 Roll Up 200 Aero 230 Aero 270 Aero 310 Aero 350 Aero 270 ALU 310 ALU 350 ALU Volume 2...

Страница 2: ...DEALS IN GENERAL WITH THE OPERATING PRECAUTIONS AND SAFETY RECOMMENDATIONS TO BE OBSERVED ONBOARD THE BOAT AND ON THE WATER VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE B...

Страница 3: ...ssure pressure 8 9 INFLATING THE BOAT 10 PRESSURE 6 Install the oars 11 EQUIPMENT ASSEMBLY CHECK ON UNPACKING CAUTION DO NOT USE A SHARP TOOL CUTTER KNIFE ETC The pack must contain 1 buoyancy tube CAD...

Страница 4: ...RESSURE FLOORBOARD DISASSEMBLY MAINTENANCE When folding the boat we recommend you leave the floorboard in place in the boat However to clean the bottom of the boat where sand and other waste may accum...

Страница 5: ...ike position fig 1 and 2 6 Check that all sections are correctly aligned fig 4 7 Flatten the apex by standing on it in the boat and pulling the lifelines to prevent the fabric from being pinched fig 2...

Страница 6: ...12 6 BOAT ASSEMBLY fig 1 A fig 1 B a floorboard b buoyancy tube c bow angle d bottom a b c d fig 2 1 5 4 2 3 6 fig 3 fig 4 7 8 1 2 3 4 5 6 1 2 3 4 5 7 9...

Страница 7: ...e boat Position B The flow is inferior to position A but provides pressure that is superior with the same effort Position C To deflate Insert the tube as indicated in figure C and pump normally C THE...

Страница 8: ...rical air pump ACCESS ask your Dealer INFLATING THE BUOYANCY CHAMBER see PRESSURE section Inflate the buoyancy mechanism balancing the pressure between the different compartments until the partitions...

Страница 9: ...flation pressure without undue force Complete inflation in position B until the recommended pressure is reached see PRESSURE section B INFLATE THE MAIN BUOYANCY TUBE AND THEN THE KEEL CAUTION NEVER US...

Страница 10: ...at is exposed to direct sunlight on the beach temperature 50 C at the recommended pressure 240 mb 3 48 PSI When you launch it temperature 20 C the temperature and internal pressure of the inflatable c...

Страница 11: ...11 12 E N G L I S H EQUIPMENT ASSEMBLY OARS THWART Install the thwart before completing inflation Clic...

Страница 12: ...o fold the boat 5 Empty the boat of all water and sand by opening the self bailers dry it 6 Fold in the 2 sides of the main buoyancy tube A fold the cones onto the transom then roll up the boat around...

Отзывы: