P a g e
|
12
3.3
Installing the Power Pack and Cell
WARNING
If you are installing the Zodiac AquaPure Ei Series APURE35C to a Goldline adaptor, it is necessary to disconnect the power to
the Goldline controller.
Zodiac recommends that any procedure requiring potential contact with live electrical wiring and/or parts other than cords and
plugs connected to electrical outlets, be completed by a contractor who is licensed and qualified in pool equipment as described
on the front cover of this manual. Failure to follow warning notices and instructions may result in property damage, serious
injury, or death.
WARNING
To avoid property damage, serious injury or death, do not operate the electrolytic cell without water circulation. A buildup of
flammable gasses which can result in FIRE OR EXPLOSION
1.
Ensure placement of the cell and the power pack will meet all the installation requirements outlined in Section 3.2.
2.
Screw the power pack bracket into position on a wall surface where it will mount securely, while ensuring it is no
more than 4.6 m (15 ft.) from the cell (see Figure 4 and 5).
3.
Position the power pack in place by aligning the bracket with the corresponding thru-holes (see Figure 5).
4.
Wire the power pack to the LOAD side of the pump or the LOAD side of the pool pump timer relay so that the
chlorinator can only come on when the pool pump comes on (see Section 3.4). Attach the bonding wire and
connect it to a common bonding point (see Section 3.5). If available, wire the power pack to an AquaLink
®
RS
Control System or PDA (see Section 3.6).
5.
Unscrew the locking ring from the cell in order to extract it from the upper clamp (see Figure 6).
6.
Press the two (2) push-buttons on either side of the upper clamp to separate the upper clamp from the lower clamp
(see Figure 6).
7.
Invert the lower clamp and place on the pipe. Mark the pipe for drilling the feeder holes (see Figure 7).
8.
Drill the feeder holes using the holesaw provided. Ensure holes are clean and smooth (see Figure 8).
9.
Use the pipe spacer as shown if mounting on a 40 mm (1½ in.) pipe (see Figure 9).
*
The Goldline brand is property of Hayward Industries, Inc. and/or its subsidiaries or affiliates.
NOTE
The pipe spacer is required for 40 mm (1 ½ in.) diameter pipe only. The spacer is not required on
50 mm (2 in.) pipe.
10.
Verify the gasket is attached to the upper clamp. The curved side of the gasket must be pointing down so that it
will create a seal with the pipe.
11.
Secure the clamps, pipe spacer, and gasket around the pipe as shown (see Figure 10)
making sure the flow
arrows on the clamp point in the direction of the water flow
(see Figure 11). Make sure the two (2) clips on
the sides of the clamp are snapped into place.
12.
Insert the o-ring into the channel on the clamp and then attach the cell (see Figure 11 and 12).
13.
Position the locking ring in proper alignment, making sure the bump aligns with the top thread (see Figure 13).
14.
Screw down the locking ring to the threaded clamp using the locking ring tool (see Figure 14).
NOTE: ensure the locking ring is level when engaging the threading clamp (see Figure 15)
15.
Securely connect the cell leads to the like colored terminals (see Figure 16).
Содержание APURE35C
Страница 35: ......