background image

BG500 Series Barrier Gate

User Manual

P a g e

|

21

Copyright©2022 ZKTECO CO., LTD. All rights reserved.

9

Boom Barrier Adjustments

Horizontal and Vertical Angle Adjustment of Barrier Boom

(Mechanical Adjustment)

Note:

The horizontal and vertical angles of the barrier boom have been adjusted before

leaving the factory. Please do not adjust them without the guidance of professionals to
avoid any mechanical damage.

1.

Adjust the horizontal position of the barrier boom

The connecting boom crank will be an overlapping structure, and the two rotation
points of the connecting boom are coincident with the output shaft of the reducer at 3
points and a line. This is the horizontal position of the barrier boom. If you find that the
barrier boom is not in level or inclined at this time, then loosen the 2 screws of the
spindle connecting arm, turn the barrier boom to the level, and then tighten the screws.

2.

Adjust the vertical position of the barrier boom (adjusted by mechanical structure)

The connecting boom crank is in an unfolded shape, and the two rotation points of the
connecting boom and the output shaft of the reducer are in an unfolded 3-point line.
This is the vertical position of the barrier boom. If it is found that the barrier boom is not
in the vertical position and is inclined at this time, then loosen the 2 screws of the rocker
(rocker-arm), then turn the barrier boom to the vertical, and tighten the screws.

Содержание BG500 Series

Страница 1: ...k you for choosing our product Please read the instructions carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual are...

Страница 2: ...aid equipment It is an essential pre requisite for the satisfactory operation and maintenance that the operating and maintenance personnel are fully familiar with the design and that the said personne...

Страница 3: ...notes etc for better operation and safety of the machine unit equipment The said additions or amendments are meant for improvement better operations of the machine unit equipment and such amendments...

Страница 4: ...ndent research and development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication f...

Страница 5: ...BOARD WIRING INSTRUCTIONS 11 CONNECTION WITH LPR CAMERA 12 CONNECTION WITH UHF CONTROLLER 13 CONNECTION WITH LOOP DETECTOR 13 CONNECTION WITH VR10 RADAR SENSOR 14 CONNECTION WITH INFRARED PHOTOCELL DE...

Страница 6: ...ort install different types of barrier arm 2 Features and Functionalities Highly energy efficient because of the DC brushless motor The modular structure makes it simple to maintain Digital control ma...

Страница 7: ...2 5s Boom Length 3m 4 5m 6m 4 5m 4 5m 4 5m Boom Type Straigh t boom Telescopic boom Straight boom with LED Folding boom Fence boom Motor Type DC 24V brushless motor Output Power 160W Output Current 10...

Страница 8: ...cannot be increased To establish new balance after cutting the boom length the spring balance must be reset The bottom of the spring has two plastic nuts for adjusting the new balance 3 When the powe...

Страница 9: ...Installation 5 3 1 Boom Installation Procedure 1 Pull the vice boom out from the main boom and install them with the two screws as shown in Figure 1 2 Install the boom to the chassis as shown in Figur...

Страница 10: ...horizontal position of the boom arm 4 Start the power supply and observe the running state of the machine If the boom arm open shaking it is then necessary to loosen the spring and slow down the spee...

Страница 11: ...and slow down the speed appropriately It is also necessary to tighten the spring and slow down the speed accordingly if the boom arm closes shaking Notes 1 Before the machine is energized to run the...

Страница 12: ...he power supply before wiring 2 Please note that to switch the input voltage to 110V you must set the DIP switch on the power supply to the following 3 Make sure the terminals are securely fastened an...

Страница 13: ...BG500 Series Barrier Gate User Manual P a g e 12 Copyright 2022 ZKTECO CO LTD All rights reserved BG500 Wiring Diagram of Mainboard Connection with LPR Camera...

Страница 14: ...t 2022 ZKTECO CO LTD All rights reserved Connection with UHF Controller Note The reader 1 and 2 of the inbio260 controller are corresponding to LOCK1 Reader 3 and 4 are corresponding to LOCK2 Connecti...

Страница 15: ...All rights reserved Coil Circumference Coil Number 3m Based on the requirements ensure that the inductance is between 100 H to 200 H 3m to 6m 5 to 6 turns 6m to 10m 4 to 5 turns 10m to 25m 3 turns 25m...

Страница 16: ...BG500 Series Barrier Gate User Manual P a g e 15 Copyright 2022 ZKTECO CO LTD All rights reserved Connection with Infrared Photocell Detector Anti smash function...

Страница 17: ...BG500 Series Barrier Gate User Manual P a g e 16 Copyright 2022 ZKTECO CO LTD All rights reserved Anti smash and Auto close function...

Страница 18: ...and power on you must complete the self check process and learn the opening and closing strokes by pressing the on and off buttons on the mainboard Mainboard Parameter Settings Key Description Menu M...

Страница 19: ...L 5 70 70 70 Horizontal adjustment of barrier boom L 6 5 5 10 Test mode selection 0 is manual 1 is automatic default L 7 0 0 0 Turn on the memory function 0 means no memory 1 means memory and 4 indic...

Страница 20: ...ion is disabled 1 to 255 is the time corresponding to delay automatic boom falling L 20 0 0 0 Remote Control Learning Instructions 1 Remote Control Pairing Long press the Menu then press to select L F...

Страница 21: ...nu button then press to select the L20 parameter and then press the Menu to set the parameter value after selection At this time the display will be 000 i e in the disabled state Set the delay value a...

Страница 22: ...ft of the reducer at 3 points and a line This is the horizontal position of the barrier boom If you find that the barrier boom is not in level or inclined at this time then loosen the 2 screws of the...

Страница 23: ...g arm and boom 2 Change the direction of the Spindle Connecting Arm and the linkage Arm 3 Turn the Limited Block to the other direction 4 After the mechanical operation you need to set the movement pa...

Страница 24: ...adapted to different boom lengths 3m boom with 4 5mm 4 5m boom with 5 5mm and 6m boom with 6 5mm If the boom is too short less than 2m do not install the spring 10 Product Packing List Material Quanti...

Страница 25: ...e adjust the motor limit parameters 4 The remote control buttons do not respond 1 The remote control is not using ZKTeco brand or it is from another model 2 The remote control does not match 3 The rem...

Страница 26: ...ose and the running speed too fast If the boom arm open shaking it is necessary to loosen the spring and slow down the speed appropriately If the boom arm close shaking it is necessary to tighten the...

Страница 27: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2022 ZKTECO CO LTD All Rights Reserved...

Отзывы: