ZIVE SP2 Instruction manual
- 10 -
Chapter 1. Pre startup checking points
1.
Hardware
Note: From serial number
R**********S ,
You must move interface board ROM write protection switch
direction to write enable direction inside of instrument for the following case
License code registration
Channel expansion setting
USB firmware upgrade
After the above modification, you must set ROM switch as write protect direction
Don’t place EMI producing equipment near this instrument (such as radio, vibration etc.).
The cell cable itself can work as antenna. (It can receive EMI noise). Never allow the cell cable to
cross or come in contact with any power line cable.
If the result data is noisy, it may be necessary to make the cell cable as short as possible. (As this
reduces induced noise.)
The counter electrode is dangerous. Do NOT touch this electrode.
Do not place any obstacle preventing air flow at bottom or the side of the unit
ZIVE SP2 should only be used with the supplied cell cable. If you use a custom made cell cable, it
is likely to create noisy data.
2.
Calibration
Calibration of the ZIVE SP2 instrument is accomplished by using independent SM toolkit software..
Calibration will be done automatically.
During calibration the cell cable must be disconnected from the instrument
Never turn off the power during calibration...
During Calibration, Do not locate EMI noise sources(radio, frequency generator, vibrator etc.) near
the ZIVE SP2.
3.
If you have trouble or questions;
If you have trouble on ZIVE SP2 or question, please send the following file and explanation to
Data file (SDO,SDE,SEO)
Содержание ZIVE SP2
Страница 3: ...ZIVE SP2 Instruction manual 3...
Страница 17: ...ZIVE SP2 Instruction manual 17 2 Front view Air flowing holes...
Страница 37: ...ZIVE SP2 Instruction manual 37 Appendix 3 Cables Dummy cell 1 Cell cable...
Страница 38: ...ZIVE SP2 Instruction manual 38 2 Aux cable...
Страница 39: ...ZIVE SP2 Instruction manual 39 3 ZRA cable...
Страница 40: ...ZIVE SP2 Instruction manual 40 4 Misc cable...
Страница 41: ...ZIVE SP2 Instruction manual 41 5 Booster Interface cable...
Страница 42: ...ZIVE SP2 Instruction manual 42 6 Dummy Cell...
Страница 43: ...ZIVE SP2 Instruction manual 43 Appendix 4 Front Panel Connectors 1 Aux connector 2 Misc connector...
Страница 44: ...ZIVE SP2 Instruction manual 44 3 Cell Connector...
Страница 45: ...ZIVE SP2 Instruction manual 45 Appendix 5 CE certificate 1 Declaration of conformity...
Страница 46: ...ZIVE SP2 Instruction manual 46 2 EMC test report...