5
Installation instructions & user manual
T210029 v2.01 Dec 2020 - ZIP HC03CTU15
Technical support
Tel: 0345 6 005 005 email: aftersales@zipindustries .co.uk www.zipwater.co.uk
SPECIFIC INSTALLATION SAFETY INFORMATION
• Correct ventilation is essential, (see page 9).
• Install on a flat surface with sufficient load bearing capacity.
• The electrical power supply requirements on the rating plate
(see page 13) and in the data table (see page 14) must be
observed.
• The water dispenser must be earthed. The resistance of the
earth connection from each exposed metal part must be less
than 1Ω.
• The water dispenser must be protected by an RCD or RCBO in
the mains electrical power supply circuit.
• Always use a new set of fittings (connectors, gaskets, o-rings
and pipes) for the installation. Previously used fittings may
affect the water quality.
!
UV
!
Precautions
Sanitising
• For safe operation, the water dispenser is designed to be
installed, commissioned and used within 48 hours.
• Should the water dispenser not be required for an extended
period of time (48 hours or more), do not fill and commission it
until ready for first use.
• The water dispenser must be sanitised during the commission
process, please contact
the Zip Water team on 0345 6 005 005
to book your commissioning service.
• For water taste and quality reasons any non-use of more than 48
hours, Zip recommend a system flush be performed. On first
use after a period of non-use, run the chilled & ambient water
functions for 60 seconds to flush the filter and system. Not
flushing the system may affect water the quality.