
Installation & Operating Instructions - 801957UK_DOMCTS - Zip ChillTap Sparkling - June 2014 V 2.01
Page 5 of 14
Installation Requirements
Installation Instructions
• A power supply of 220-240 Volt AC, for connection to the heater via a 13
amp fused spur. This switch must provide all-pole disconnection with a
contact separation of at least 3mm, installed in accordance with IEE wiring
rules.
• Operating temperatures 5ºC - 35ºC.
• Water pressure 0.14 MPa - 0.70 MPa (1.4 bar -7 bar)
• A potable water supply with a minimum supply pressure of 0.14 MPa (1.4 bar).
For best results we recommend a minimum static pressure of 0.2 MPa (2
bar).
Step A - Installing the Tap
Position and install the carafe filler at the back of the sink or on the Font,
where there is a minimum 52mm wide flat area within the draining area of the
sink.
Make sure the selected position allows the carafe filler spout to overhang the
sink bowl.
Use a 25mm sheet metal punch to create a neat hole without burrs.
Remove the large nut with the stainless steel and rubber washers from the
base of the carafe filler, leaving the rubber-sealing ring (o-ring) in place.
Fit the carafe filler and seal to the sink, oriented so both the operating levers
are easily accessible.
General instructions for
John Guest connections
Special Tools Required
In addition to normal tools, the following will be required:
• 25mm diameter sheet metal hole punch for sink tops. (not supplied)
• 25mm diameter hole saw for timber bench tops. (not supplied)
When installing a Font unit:
• 108mm diameter sheet metal or hole saw to suit surface being cut.
NOTE:
Ensure all John Guest tube
ends are cut clean and square.
Sink or
benchtop