Zinco Fallnet SB 200-Rail Скачать руководство пользователя страница 9

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Documentation and Planning of Inspections 

Object: ……………………………………………………………………………….. 

Inspection 

Date 

Signature 

Date for next inspection 

1

st

 year 

 

 

 

2

nd

 year 

 

 

 

3

rd

 year 

 

 

 

4

th

 year 

 

 

 

5

th

 year 

 

 

 

6

th

 year 

 

 

 

7

th

 year 

 

 

 

8

th

 year 

 

 

 

9

th

 year 

 

 

 

10

th

 year 

Authorise a full inspection by the manufacturer 

Person/company authorised by the manufacturer: …………………………………..………… 

Control Card 
Fallnet

®

 SB 200-Rail 

Page 9 of 9 

Содержание Fallnet SB 200-Rail

Страница 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Страница 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Страница 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Страница 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Страница 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Страница 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Страница 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Страница 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Страница 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...

Отзывы: