Zinco Fallnet SB 200-Rail Скачать руководство пользователя страница 2

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Installation Instructions  
Fallnet

®

 SB 200-Rail 

2.2 Measuring and Positioning the Solar Base SB 200/Rail Supports  

 

The  positioning  of  the  SB  200  Solar  Base  plates  with  the  rail  supports 
(maximum  distance  between  rail  supports  is  1.5  m)  is  to  be  measured 
using  a  map  of  the  roof.  The  Solar  Base  SB  200  must  lie  flat,  straight 
and on a clean and suitable (see 1.2). 
 
The multiple perforation of the SB Rail holders makes it possible to place 
them in such a way that the rail line later runs with sufficient distance to 
the PV modules or to the railing and the distance of the rail to the edge 
of the fall specified in the planning is maintained. 
 
We  recommend  that  you  let  the  ZinCo  technical  department  plan  or 
check the requirement and location plans.  
 
2.3 Assembly of the rail 

 

 

 

Je nach Einplanung besteht eine Anschlagschiene aus: 

 

- rail 6 m 

 

- rail 3 m   

 

- rail 2 m 

- joint connector 

- end piece   

 

- 90°-corner piece 

- 3-way junction incl. support 

- runner 

 

 

- rail special length 

 
-  Every  rail  support  is  equipped  with  a  square-head  bolt.  Using  this 
  square-head bolt the rail is 

threaded with the T-slot and thus connected 

  to the already positioned grid unit.

 

Required tools: 

 

- wrench/ratchet 17.0 
- allen or allen key size 6.0 
- torque wrench 
- optionally ZinCo  Drilling  Set  to  manufacture  rail  pieces  of  special 

lenghts on-site 

≤ 5 mm 

The 

rail track is extended by attaching further pieces of rail by means 

  of  butt  joint  connectors.  The  self-locking  nuts  are  to  be  tightened 
  manually  (max. 20  Nm).  A  maximum  gap  of 5 mm  between  the  rail 
  pieces is to be observed.

 

-  Before  completing  the  rail  track,  insert  the  mobile  attachment  point 
  (runner) onto the rail.

 

 

-  Any  required  fitting  pieces  can  be  manufactured  directly  at  the  
  construction site using the ZinCo Drilling Set (see separate instructions).

 

 

-  Depending  on  the  site  planning,  a  closed  loop-shaped  system  or  a 
  termination with ending pieces is possible.

 

 

-  Finishing with rail end pieces:

 

  Screw end pieces onto the ends of the rail using butt joint connectors. 
  The end pieces are threaded over the rail support of the grid unit AE 
  and  fastened  between  the  first  or  last  butt  joint  connector  and  the 
  stop  screw  of  the  end  piece  (available  room  approx.  120  mm).  
  A longer rail overhang is not permitted!

 

 
 
 
 
 
 
 
 
 
 
 

 
 

 

-   Finally, check all screw connections and tighten them.

 

 

120 mm 

Assembly end piece 

Assembly joint connector 

variant 1: 

variant 2: 

Assembly rail and support 

Page 2 of 9 

Содержание Fallnet SB 200-Rail

Страница 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Страница 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Страница 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Страница 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Страница 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Страница 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Страница 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Страница 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Страница 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...

Отзывы: