Zinco Fallnet SB 200-Rail Скачать руководство пользователя страница 4

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Your roof protects your building, the contents and any valuables in it. In 
order to have the benefit of a fully-functioning roof over a long period of 
time,  your  roof  must  be  installed  professionally  and  must  be  inspected  at 
regular  intervals  during  its  lifetime  and,  where  necessary,  repair  work 
carried  out.  Therefore,  it  is  important  to  ensure  that  any  works  on  the 
roof are carried out safely. The client (and later on possibly other) owner 
also have a duty here and are responsible for adherence to any regulations 
pertaining to occupational safety on a roof. 

 

Fallnet

®

 SB 200 Rail in combination with a solar installation (photovoltaic 

or solar thermal) or a railing system and a correspondingly high load of 
suitable bulk material (e.g. ZinCo system soil, Zincolit

®

, gravel 16/32 mm 

or slabs in a chippings bed) represents an anchoring device in accordance 
with DIN EN 795:2012 types D and E for fall protection on flat roofs with 
a roof pitch of up to 5°. 
 
1.Fallnet

®

 SB 200-Rail - System components: 

 

a. Solar Base plates  

 

ZinCo  Solar  Base

®

  SB  200  or  GB  or  GB  corner,  of  hard  plastic  (ABS), 

length  ca.  2.0  x  1.0  m,  height  ca.  43  mm,  with  integrated  aluminium 
profiles and two fastening screws; can be used as support plates, e.g. for 
the  ZinCo  SGR  solar  base  frames  or  in  conjunction  with  corresponding 
post  holders  made  of  galvanised  steel  for  a  wide  range  of  railing  
solutions.  
At  least  five  solar  bases  mechanically  connected  to  each  other  in  
conjunction with a load form the basis to absorb and transfer load in the 
event of a fall. The load of at least 120 kg/m² (incl. superstructures such 
as  PV modules)  for roof  pitches  up  to  2°  or 140  kg/m²  for roof  pitches 
>2°  to  5°  can  be  applied  e.g.  in  the  form  of  ZinCo  system  soil,  gravel 
16/32  mm  or  comparable  bulk  material  or,  in  the  case  of  railing  
solutions, in the form of slabs in a bed of chippings. 
 
b. SB Rail support 

 

The connection between the solar bases and the rail is made by SB Rail 
holders made of stainless steel. These are available in lengths of 0,6 m 
and 1,2 m. The multiple perforation of the holders makes it possible to 
mount them on the fastening screw of the base plate in such a way that 
the  rail  later  runs  with  sufficient  distance  to  the  PV  modules  or  to  the  
railing and the specified distance to the fall edge is maintained. 
 
c. Rail with runner, further accessory 

 

The supports are connected by an anchorage rail made of high quality 
aluminium.  A  mobile  attachment  point  runs  along  the  rail  on  its  four 
stainless  steel  rollers  (therefore  also  called  “runner”).  The  carabineer 
hook  of  the  personal  protective  equipment  can  only  be  attached  to  the 
eyelet of this runner. In order to prevent the runner from slipping off the 
rail at its ends, end pieces with “stoppers” must be mounted there. The 
single  pieces  of  the  rail,  which  have  a  length  of  up  to  6  m,  are  held  
together by special butt joint connectors. Gaps between two pieces shall 
not exceed 5 mm. 
 
d. Documents 

 

The delivery scope includes the following documents, which the installer 
must hand to the client:  

 

   

- Installation Instructions 

   

- User Instructions  

   

- Control Card. Please record the serial number of the Fallnet

®

  

 

  SB 200-Rail in the chart. This number can be found on the  

 

  identification label attached to the product. Fallnet

®

 SB200- 

 

  Rail must be inspected regularly. 

Furthermore the following documents need to be handed over: 

 

   

- installation documentation 

   

- eventually separate site planning (if planning was done by ZinCo). 

 

  If the planning has not been carried out by ZinCo, it must be  

 

  approved by ZinCo Application Engineering. 

 
2. Scope and requirements for use 

 

Fallnet

®

  SB  200-Rail  must  only  be  used  for  the  intended  purpose  as  a 

fixing  device  for  personal  protection  equipment.  Fallnet

®

  SB  200-Rail 

must  not  be  used  for  lifting  weights  or  for  attaching  objects.  Any  
modification  or  addition  to  any  of  the  system  components  requires  the 
prior written permission of the manufacturer. 

 

Please note also: 

 

Fallnet

®

 SB 200-Rail may only be used by max. 1 person (max. 100 kg, 

  including  equipment)  in  conjunction  with  personal  protective  equipment 
  (PPE, such as the ZinCo PPE-Set) acc. To EN 363. The harness according 
  to EN 361 may only be used with tested and approved components. 

 

-  Additional persons (max. 100 kg, including equipment) can use the rail 
  system with an additional anchorage point (runner) if it is ensured that a 
  distance of at least 4.5 metres (3 free rail holders) is maintained. 

 

-  The  use  of  Fallnet

®

  SB  200-Rail  is  permitted  up  to  a  maximum  roof 

  inclination of 5° in the direction of the edge which is to be secured.

 

 

-  Fallnet

®

  SB  200-Rail  should  only  be  installed  on  suitable  subsurfaces 

  e.g.  either  on  the  filter  sheet  (multi-layer  build-up)  or  on  a  protective 
  mat (mono-layer build-up), see Installation Instructions. 
 

 

Important: Direct contact between the load (bulk material) and the grid  
 

elements is required at all times. 

 

If  the  site  planning  is  done  by  ZinCo  GmbH,  Fallnet

®

  SB  200-Rail  is  

always applied as a fall arrest system. This means that it is planned with a  
uniform  rope  length,  which  is  dimensioned  so  that  the  roof  edge  can  be 
reached,  but  one  can  not  fall  at  all. The  planning  can  be  done  in  such  a 
way that the rail runs partly through the area at risk of falling (≤ 2 m to the 
fall edge), provided that the entry point is located outside the danger zone.

 

 

Nevertheless,  misuse  -  in  particular  an  incorrectly  set  rope  length  - can 
never  be  completely  ruled  out.  Fallnet

®

  SB  200-Rail  has  therefore  

proven in extensive tests that it can also reliably absorb a fall.

 

 
Precondition for this is that the minimum fall distance to the ground (fall 
height)  must  be  such  as  to  prevent  a  person  hitting  the  ground  in  the 
case of a fall event and to allow the person to swing freely. 
 
The required minimum fall distance to the ground (potential impact area) is 
resulting from the following parameters:  
 
-  the  part  of  the  connecting  device  being  pulled  over  the  fall  edge   
  (=  maximum  rope  length  to  the  fall  edge  minus  the  shortest  rope 
  length, rectangular to the fall edge), 

 

-  height the person attached,  

 

-  stretch of rope and safety harness 

 

-  rupture distance of the fall absorber 

 

-  displacement and deformation of fixing device (max. 1.0 m) and 

 

-  1.0 m safety value.

 

User Instructions 
Fallnet

®

 SB 200-Rail 

Page 4 of 9 

Содержание Fallnet SB 200-Rail

Страница 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Страница 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Страница 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Страница 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Страница 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Страница 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Страница 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Страница 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Страница 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...