Zinco Fallnet SB 200-Rail Скачать руководство пользователя страница 3

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Installation Instructions  
Fallnet

®

 SB 200-Rail 

 Important: 

 

In  general,  the  material  temperature  during  installation  should  not  be 
below +5 °C. 

 

Applying  the  graphite  or  copper  paste  which  is  included  in  the  delivery 
will prevent the stainless steel screws from seizing.  
 
 
2.4 Application of the required load 

 

Prior to the application of the required load the on-site situation needs to 
be documented and photographed if necessary.  

The  solar  bases  of  Fallnet

®

  SB  200-Rail  must  be  evenly  filled  and  

covered with suitable bulk material. In the case of solar installations, this 
can be done with ZinCo system soil, Zincolit

®

, gravel with a grain size of 

16/32 mm or a comparable bulk material. In the case of railings, the ballast 
can also be provided by a slab covering laid in a bed of chippings. 
 

* These minimum values include the dead weight of the superstructures 
(e.g.  PV  modules,  collectors,  railings,  etc.)  and  apply  to  the  function  as 
fall protection. If higher superimposed loads have to be applied according 
to the static calculation, e.g. to prevent a solar installation from lifting due 
to wind suction, these must of course be taken into account! 
 

The values apply for the dry state of the bulk material. The layer thickness of 
the bulk material used depends on its bulk density (dry).  
To  achieve  the  120  kg/m²,  for  example,  the  solar  bases  must  be  evenly 
filled  and  covered  with  at  least  85  mm  of  Zincolit

®

  or  System  Substrate 

Sedum Carpet. 40 mm  thick  concrete  slabs  laid  in  a 40 mm  thick  gravel 
bed, including backfilling, result in a superimposed load of approx. 180 kg/m². 
For  reasons  of  UV  protection,  a  gravel  cover  must  reach  at  least  50  mm 
above the upper edge of the plastic grid. 

 

  Important:  Direct  contact  between  the  load  (bulk  material)  and  the 

grid elements is required at all times. 
 
 
3 Completion 

 

Make  sure  that  all  work  is  done  professionally  according  to  the  site  
planning and the Installation Instructions. Check the identification label at 
the  point  of  entry,  it  must  be  permanently  well  recognizable.  Only  rail  
systems marked with a label may be used.

 

 
3.1 Installation documentation 

 

The  installation  documentation  allows  for  providing  evidence  of  a  
professional installation to the client. Furthermore it is an indispensable 
base for future inspections of the Fallnet

®

 SB 200-Rail fixing devices.  

A  template  for  the  installation  documentation  is  available  as  a  PDF  file 
from  the  manufacturer.  Document  copies  must  be  handed  over  to  the 
client after installation and must be kept on the object for future inspections 
of the Fallnet

®

 SB 200-Rail.

 

 
 
 

Required information: 

 

- address of property  
- installation company 
- technician in charge of installation 
- Fallnet

®

 SB 200-Rail serial number (see runner or label) 

- details of superimposed load (type of bulk material, weight, 
  include delivery note if relevant)  
- site planning (please include serial number(s) here too)  

 
The  site  planning  should  be  affixed  to  the  building  where  it  is  clearly 
visible, e.g. at the roof access point. 
  
Statement issued by the technician in charge of installation (signature): 

 

 

 

- the Fallnet

® 

SB 200-Rail Installation Instructions were adhered to 

 

 

- installation was carried out as planned 

 

 

- the minimum load requirements have been adhered to 

 

 

- photo documentation, in particular of details that are no  

 

 

  longer visible after installation.  

 
3.2  Handing  over  the Fallnet

®

  SB 200-Rail  documentation  to  the  client/

owner 

 

The delivery scope includes the following documents, which the installer 
must hand to the client: 

- Installation Instructions and User Instructions 
- Installation documentation 
- Control card, Fallnet

®

 SB 200-Rail 

must be maintained and  

inspected regularly. Please enter serial numbers (see runner or 
label)

 

- Site planning 

 
3.3 Queries 

 

Should  you  have  any  queries,  or  be  unsure  about  the  correct  use/
installation of the product or require further detailed information for your 
own  specific  building  project,  please  contact  ZinCo  GmbH,  Hotline 
phone +49 7022 6003-0.  
 
 
 
 
 
 

Documentation - Corresponding templates can be found under: 

https://zinco-greenroof.com/downloads

 

Required load* for Fallnet

®

 SB 200-Rail: 

 

min. 120 kg/m² (roof inclination 0° to 2°) 
min. 140 kg/m² (roof inclination > 2° to 5°) 

Page 3 of 9 

Содержание Fallnet SB 200-Rail

Страница 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Страница 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Страница 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Страница 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Страница 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Страница 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Страница 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Страница 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Страница 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...

Отзывы: