Zinco Fallnet SB 200-Rail Скачать руководство пользователя страница 1

S

u

b

je

ct

 t

o

 t

e

ch

n

ic

a

a

lte

ra

tio

n

a

n

d

 p

ri

n

ti

n

g

 e

rr

o

rs

 •

 F

ir

st

 e

d

it

io

n

 0

3

/2

0

0

8

R

e

vi

se

d

 0

7

/2

0

2

3

 

ZinCo GmbH

 

Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany   
Phone +49 7022 6003-0 
[email protected] ∙ www.zinco-greenroof.com  

Installation Instructions  
Fallnet

®

 SB 200-Rail 

Fallnet

®

 SB 200 Rail in combination with a solar installation (photovoltaic 

or solar thermal) or a railing system and a correspondingly high load of 
suitable bulk material (e.g. ZinCo system soil, Zincolit

®

, gravel 16/32 mm 

or slabs in a chippings bed) represents an anchoring device in accordance 
with  DIN  EN  795:2012  types  D  and  E  for  fall  protection  on  flat  roofs 
with a roof pitch of up to 5°. 
A fixing point (the so-called runner) may only be used by one person (up 
to 100 kg) at a time and this person should be wearing personal protective 
equipment  (PPE,  e.g.  ZinCo  PPE-Set)  in  accordance  with  EN  363.  The 
safety harness, in accordance with EN 361, can only be used in conjunction 
with tested and approved components.

 

 
Important note: 

 

We  would  like  to  state  explicitly  that,  regardless  of  product  liability,  ZinCo 
shall only assume liability for the consultancy process where installation 
has been carried out in line with ZinCo site planning. Installation without 
planning  carried  out  by  ZinCo  is  at  your  own  risk.  The  assembly  and 
installation instructions as well as the instructions for use, both of which 
are supplied with the products, must be observed regardless of this. 

We recommend having Fallnet

®

 SB 200-Rail planned or checked by ZinCo 

Technical Department before starting installation.

 

 
1. Prior to installation 

 

1.1 Check of the scope of delivery and condition of system components 

 

The  delivery  of  an  object-specific  Fallnet

®

  SB  200-Rail  safety  device 

comprises: 
 

a. Fallnet

®

 SB 200-Rail components

, like e.g. 

 

ZinCo Solar Base

®

 SB 200, of hard plastic (ABS), length ca. 2.0 x 1.0 m, 

height ca. 43 mm, with integrated aluminium profiles and  
two fastening screws; can be used as support plates,  
e.g. for the ZinCo SGR solar base frames  
or in conjunction with corresponding  
post holders made of galvanised steel  
for a wide range of railing solutions.  
   
 
 
 
 
 
 
SB Rail holder made of stainless steel, for connecting the rail to the solar 
base, available in lengths of 600 mm and 1200 mm. 
 

 

 

 

 
 

 
 
 
 

Rails made of a high quality aluminium alloy in standard lengths of 2.0 m, 
3.0 m and 6.0 m, butt joint connectors, end pieces, runners, etc.

 

 

The  required  quantities  and  characteristics  of  the  components  can  be 
found in the delivery note. 

 

b. Documents included with each order:  

 

Installation Instructions, User Instructions and Control Card.  
The installation plan (if planned by the ZinCo GmbH) is provided separately to 
the person stating the order and is to be handed to the client.  
 
Please note:  

 

Incomplete,  incorrect  or  defective  deliveries  are  to  be  objected  
immediately.  
 
1.2 Check of the initial situation 

 

The basis for a perfect function of Fallnet

®

 SB 200-Rail is that at least five  

SB 200 solar bases (in a row or across a corner), mechanically connected 
to each other by mounting profiles or guardrail rails, are present and serve 
as a load-bearing surface (total area thus at least 10 m²). 
Before  starting  installation,  check  whether  the  roof  construction  is  suitable 
for the loads to be applied, make sure that the maximum possible roof 
pitch  (5°)  is  not  exceeded,  check  whether  the  waterproofing,  root  protection, 
etc.  have  been  applied  professionally.  If  there  are  any  doubts,  these 
must be clarified and if necessary eliminated before installation. 
 
1.3 Admissible types of installation 

 

The following types of installation are admissible for Fallnet

®

 SB 200-Rail: 

 
a. With multi-layer build-ups:  

 

Fallnet

®

 SB 200-Rail is applied above the drainage layer (e.g. Fixodrain

®

  

XD 20-Bahnen) directly over the corresponding filter sheet. 
 
b. With mono-layer build-ups: 

 

Fallnet

®

 SB 200-Rail is applied directly over the protection layer (> 300 g/m²), 

whereby  drainage  elements  of  a  comparable  height  (e.g.  Floradrain

®

  

FD 40-E) are subsequently to be fitted into the spaces between the SB 200 
elements.

 

 
 

2. Installation instructions 

 

2.1 Completing the Solar Base SB 200/Attaching the Rail Supports 

 

Fallnet

®

  SB  200-Rail  can  be  combined  with  the  ZinCo  Solar  Base

®

  

SB 200 in two different ways: 

 

-  ZinCo Solar Base

®

 SB 200 and Solar Base Frame SGR (see variant 1): 

 

  The rail supports are to be placed on  the  screws  of  the  Solar  Base  
  SB  200.  Then  the  Solar  Base  Frame  is  to  be  placed  on  the  rail  
  supports and attached (> 20 Nm) to the SB 200 base plate using both 
  nuts. 

 

-  Guardrail Base GB-Rail / GB-Rail Corner (see variant 2): 

 

 

The  rail  supports  are  placed  on  the  posts  of  the  post  supports  of  the  

  GB-Rail / GB-Rail Corner. It should be connected (> 20 Nm) using a    
  carriage bolt (including U-washer and a stop-nut). 

 

To achieve the frictional connection between rail supports and grid units, 
the  first  grid  element  unit  is  moved  over  the  rail  support  with  its  colour 
coding  and  pressed  by  foot  to  snap.  Install  all  grid units  in  such  a way 
that the rail support is located centrally in the grid unit (one more in the 
centre resp. two more at the beginning and the end of the rail). All grid 
elements  of  a  grid  unit  must  be  plugged  together  at  the  connection 
points and thus form a tension distributing disc. 

Page 1 of 9 

Содержание Fallnet SB 200-Rail

Страница 1: ...th each order Installation Instructions User Instructions and Control Card The installation plan if planned by the ZinCo GmbH is provided separately to the person stating the order and is to be handed...

Страница 2: ...is equipped with a square head bolt Using this square head bolt the rail is threaded with the T slot and thus connected to the already positioned grid unit Required tools wrench ratchet 17 0 allen or...

Страница 3: ...e site planning and the Installation Instructions Check the identification label at the point of entry it must be permanently well recognizable Only rail systems marked with a label may be used 3 1 In...

Страница 4: ...eces shall not exceed 5 mm d Documents The delivery scope includes the following documents which the installer must hand to the client Installation Instructions User Instructions Control Card Please r...

Страница 5: ...the equipment who have the necessary knowledge and who in terms of their health are ca pable of using the equipment e g no impairment due to medication alcohol abuse coronary or circulatory problems...

Страница 6: ...onsultancy process where installation has been carried out in line with ZinCo site planning Installation without site planning carried out by ZinCo is at your own risk Where the fixing device Fallnet...

Страница 7: ...ar base plates and equip with the required SB Rail holders 2 Lay out the first row of solar base plates and mount SB Rail holders in the direction of the fall edge s 8 Applying the required load min 1...

Страница 8: ...safety harness in accordance with EN 361 can only be used in conjunction with tested and approved components Regular Inspections Regular checks are required to ensure that the fixing device is functi...

Страница 9: ...zinco greenroof com www zinco greenroof com Documentation and Planning of Inspections Object Inspection Date Signature Date for next inspection 1st year 2nd year 3rd year 4th year 5th year 6th year 7...

Отзывы: