INSTALLATION AND OPERATING INSTRUCTIONS:
GEH6000IL/GED6000IL
INSTALLATION AND OPERATING INSTRUCTIONS:
GEH6000IL/GED6000IL
14
15
EN / 2021-07-28
DDOC00212 / 0
EN / 2021-07-22
DDOC00212 / 0
Zimmer GmbH
•
Am Glockenloch 2
•
77866 Rheinau, Germany
•
+49 7844 9138 0
•
www.zimmer-group.com
Zimmer GmbH
•
Am Glockenloch 2
•
77866 Rheinau, Germany
•
+49 7844 9138 0
•
www.zimmer-group.com
10.2 Installing GED6000IL
The product can be installed with its base on
the mounting piece.
►
Insert the straight pin or the centering sleeve
into the provided fits on the product.
•
Straight pin or centering sleeve,
depending on variant.
►
Use the straight pin or centering sleeve
to position the product on the provided
mounting piece.
►
Use the mounting screws to secure the
product on the mounting piece.
bq
br
3
br
3
Fit
bq
Centering sleeve
br
Mounting screw
10.3 Installing the energy supply
CAUTION
Destruction of the product
In the event that the polarity of the product is reversed, the product may be destroyed as a result of the duration
of current of the IO-Link chip C/Q (pin 4) being too long.
►
Connect the product correctly.
INFORMATION
The cables that are used by Zimmer GmbH feature a minimum bending radius of 10 x the outer diameter.
►
Do not fall below this bending radius.
►
Secure free-hanging cables to prevent excessive motion loads or pinching.
►
For information about the suitable power supply cables, refer to our website.
►
Attach the power supply cable.