
14. Insert the connecting cables (4) of the solenoids and the release monitoring as shown in the
picture in the terminal box area (6) and connection box (5).
15. Connect the magnet coils and the release monitoring according to the wiring diagram(20) in the
top cover of the connection box(5).
16. Please make sure that the varistors (3) match the brake voltage:
brake voltage 207 V - varistor K250
brake voltage 24 V - varistor K30
17. Fit strain reliefs (2).
18. Mount the absolute encoder (see chapter "Replacement of the absolute encoder").
8.3.2.4
Check the micro switches for the release monitoring
After the mounting of the brake, the function of the micro switches shall be checked.
1. Connect the circuit inductor to the connecting terminals 3/4 and 8/9 respectively (normally open
contact).
2. Check the function of the micro switch:
- Brake de-energised: contact is open.
- Brake energised: contact is closed.
3. If the function is not given, the micro switches have to be adjusted (see chapter "Adjusting the
micro switches for the release monitoring").
Service and maintenance
$7%$B*%
Part.-No. 01008166-GB (
EU-BD 845
)
25/68
2ULJLQDORSHUDWLQJLQVWUXFWLRQV
ZAtop
–
model series SM160.30B/40B