
Output curve P1
[V]
[%]
0
20
(18°)
40
(36°)
60
(54°)
80
(72°)
100
(90°)
04.08.2008
v_kennl_anlaog_ausg_6pkt.vsd
Out
1
2
3
4
5
6
7
8
9
10
R
(K)
P5
P4
P3
P2
P1
P0
R
Pband
(K)
Shutter bracket
Output curve P2
Output curve P3
Output curve P4
Output curve P5
8
Start-up
8.1
Prerequisites for commissioning
Attention!
1. You must mount and connect the device in accordance with the operating instructions.
2. Double check that all connections are correct.
3. The mains voltage must match the information on the rating plate.
4. The rated current on the rating plate will not be exceeded.
5. Make sure that no persons or objects are in the hazardous area.
9
Settings for operation
9.1
Menu overview for operation
S:20.0
°
SH:94%
▼
▲
Ventilation
▼
▲
Alarm
▼
▲
Heating
P
↓
↑
▼
+
▲
=
|
ESC
|
P
↓
↑
▼
+
▲
=
|
ESC
|
P
↓
↑
▼
+
▲
=
|
ESC
|
P
↓
↑
▼
+
▲
=
|
ESC
|
Operating Instructions
Acontrol
–
model series PTE-6AHQ / PTE-10AHQ
Start-up
L-BAL-E044-GB 1911 Index 003
Part.-No.
18/36